Reformulation, linearization, and a hybrid iterated local search algorithm for economic lot-sizing and sequencing in hybrid flow shop problems
暂无分享,去创建一个
[1] Mostafa Zandieh,et al. The economic lot scheduling problem with deteriorating items and shortage: an imperialist competitive algorithm , 2012 .
[2] Quan-Ke Pan,et al. Self-adaptive fruit fly optimizer for global optimization , 2017, Natural Computing.
[3] Onder Bulut,et al. An artificial bee colony algorithm for the economic lot scheduling problem , 2014 .
[4] Quan-Ke Pan,et al. An effective discrete invasive weed optimization algorithm for lot-streaming flowshop scheduling problems , 2018, J. Intell. Manuf..
[5] Ping Chen,et al. Self-adaptive perturbation and multi-neighborhood search for iterated local search on the permutation flow shop problem , 2015, Comput. Ind. Eng..
[6] Seyyed M. T. Fatemi Ghomi,et al. Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines , 2007, Appl. Math. Comput..
[7] Liang Gao,et al. Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times , 2017, Appl. Math. Comput..
[8] Candace Arai Yano,et al. The economic lot and delivery scheduling problem: the common cycle case , 1995 .
[9] Seyyed M. T. Fatemi Ghomi,et al. Production , Manufacturing and Logistics A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains , 2006 .
[10] Avijit Banerjee,et al. Integrated Multiproduct Batch Production and Truck Shipment Scheduling under Different Shipping Policies , 2016 .
[11] Behrooz Karimi,et al. Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: The finite horizon case , 2006, Appl. Math. Comput..
[12] M. K. El-Najdawi. A job-splitting heuristic for lot-size scheduling in multi-stage, multi-product production processes , 1994 .
[13] Shaukat A. Brah,et al. Heuristics for scheduling in a flow shop with multiple processors , 1999, Eur. J. Oper. Res..
[14] John I. S. Hsu,et al. Common cycle scheduling in a multistage production process , 1990 .
[15] Alan S. Manne,et al. On the Job-Shop Scheduling Problem , 1960 .
[16] Ardeshir Bahreininejad,et al. Optimization of economic lot scheduling problem with backordering and shelf-life considerations using calibrated metaheuristic algorithms , 2015, Appl. Math. Comput..
[17] Jwm Will Bertrand,et al. The finite horizon economic lot sizing problem in job shops: The multiple cycle approach , 2001 .
[18] Yi Liao,et al. Multi-product lot scheduling with backordering and shelf-life constraints , 2013 .
[19] Quan-Ke Pan,et al. Iterated search methods for earliness and tardiness minimization in hybrid flowshops with due windows , 2017, Comput. Oper. Res..
[20] Mostafa Zandieh,et al. Algorithms for a realistic variant of flowshop scheduling , 2010, Comput. Oper. Res..
[21] Jack D. Rogers. A Computational Approach to the Economic Lot Scheduling Problem , 1958 .
[22] Mehmet Fatih Tasgetiren,et al. Iterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterion , 2017, Comput. Oper. Res..
[23] Fayez F. Boctor,et al. The impact of sequencing decisions on multi-item lot sizing and scheduling in flow shops , 1999 .
[24] Xavier Tort-Martorell,et al. An efficient iterated local search algorithm for the total tardiness blocking flow shop problem , 2013 .
[25] Liang Gao,et al. An Iterated Local Search Algorithm for the Lot-Streaming Flow Shop Scheduling Problem , 2014, Asia Pac. J. Oper. Res..
[26] Candace Arai Yano,et al. Cyclic scheduling to minimize inventory in a batch flow line , 1994 .
[27] Pierre Hansen,et al. Variable Neighborhood Search , 2018, Handbook of Heuristics.
[28] Paul R. Kleindorfer,et al. Common cycle lot-size scheduling for multi-product, multi-stage production , 1993 .
[29] Jing Xiao,et al. A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times , 2015, Comput. Oper. Res..
[30] Christoph H. Glock,et al. The impact of batch shipments on the Economic Lot Scheduling Problem , 2016, Comput. Ind. Eng..
[31] Alcides R. Santander-Mercado,et al. The economic lot scheduling problem: a survey , 2016 .
[32] Liang Gao,et al. An effective modified migrating birds optimization for hybrid flowshop scheduling problem with lot streaming , 2017, Appl. Soft Comput..