Condition based Maintenance Optimization for the Hydro Generating Unit with Dynamic Economic Dependence

This paper considers a condition-based maintenance (i.e. CBM) model for the hydro generating unit in the deregulated power system. As the downtime cost of the generating unit varies according to the time-varying electricity price, the economic dependence among the critical component of the generating unit is dynamic. In this paper, the proposed DynamicEconomic-Dependence and proportional hazards model based CBM policy considers the dynamic economic dependence among components as well as the reliability and the monitoring information of different critical components. An example for the hydro generating unit is presented to verify the effectiveness of the proposed condition based maintenance policy.

[1]  Roy Jensen,et al.  The Economics of Power System Reliability and Planning , 1979 .

[2]  H. M. Merrill,et al.  Power plant maintenance scheduling: optimizing economics and reliability , 1991 .

[3]  David F. Percy,et al.  Generalized proportional intensities models for repairable systems , 2006 .

[4]  Mahmut Parlar,et al.  A survey of maintenance models for multi-unit systems , 1991 .

[5]  Luca Podofillini,et al.  Condition-based maintenance optimization by means of genetic algorithms and Monte Carlo simulation , 2002, Reliab. Eng. Syst. Saf..

[6]  Gerard Ledwich,et al.  Distribution Network Optimisation for Enhanced Reliability , 2002 .

[7]  Daming Lin,et al.  A review on machinery diagnostics and prognostics implementing condition-based maintenance , 2006 .

[8]  Jonathan D. Cryer,et al.  Time Series Analysis , 1986 .

[9]  Andrew K. S. Jardine,et al.  Optimizing a mine haul truck wheel motors’ condition monitoring program Use of proportional hazards modeling , 2001 .

[10]  Hongzhou Wang,et al.  A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..

[11]  Viliam Makis,et al.  A decision optimization model for condition‐based maintenance , 1998 .

[12]  Viliam Makis,et al.  A Control-Limit Policy And Software For Condition-Based Maintenance Optimization , 2001 .

[13]  Gwilym M. Jenkins,et al.  Time series analysis, forecasting and control , 1972 .

[14]  Sandip R Sharma Feasibility Study Of Options For Aging Hydro-power Generation Facility , 2007 .

[15]  Joseph Mathew,et al.  Rotating machinery prognostics. State of the art, challenges and opportunities , 2009 .

[16]  Menachem Berg,et al.  Comparison of Age, Block, and Failure Replacement Policies , 1978, IEEE Transactions on Reliability.

[17]  Xitong Zheng,et al.  A maintenance policy for repairable systems based on opportunistic failure-rate tolerance , 1991 .

[18]  Rommert Dekker,et al.  A review of multi-component maintenance models with economic dependence , 1997, Math. Methods Oper. Res..

[19]  Zhigang Tian,et al.  Condition based maintenance optimization for multi-component systems using proportional hazards model , 2011, Reliab. Eng. Syst. Saf..

[20]  L. C. Thomas,et al.  A survey of maintenance and replacement models for maintainability and reliability of multi-item systems , 1986 .

[21]  A. Papalexopoulos,et al.  Competitive procurement of ancillary services by an independent system operator , 1999 .

[22]  Yasuhiro Hayashi,et al.  An algorithm for thermal unit maintenance scheduling through combined use of GA, SA and TS , 1997 .

[23]  Ronald N. Allan,et al.  Bibliography on the Application of Probability Methods in Power System Reliability Evaluation 1996-1999 , 1984 .