A risk‐based approach to manage non‐repairable spare parts inventory

Purpose – The purpose of this paper is to propose a risk‐based approach for spare parts demand forecast and spare parts inventory management for effective allocation of limited resources. Design/methodology/approach – To meet the availability target and to reduce downtime, process facilities usually maintain inventory of spare parts. The maintaining of non‐optimized spare parts inventory claims more idle investment. Even if it is optimized, lack of attention towards the critical equipment spares could threaten the availability of the plant. This paper deals with the various facets of spare parts inventory management, mainly risk‐based spare parts criticality ranking, forecasting, and effective risk reduction through strategic procurement policy to ensure spare parts availability. A risk‐based approach is presented that helps managing spare parts requirement effectively considering the criticality of the components. It also helps ensuring the adequacy of spare parts inventory on the basis of equipment criticality and dormant failure without compromising the overall availability of the plant. Findings – The paper proposes a risk‐based approach that used conjugate distribution technique with the capability to incorporate historical failure rate as well as expert judgment to estimate the future spare demand through posterior demand distribution. The approach continuously updates the prior distribution with most recent observation to give posterior demand distribution. Hence the approach is unique in its kind. Practical implications – Appropriate spare parts unavailability could have great impact on process operation and result in costly downtime of the plant. Following proposed approach the availability target can be achieved in process industry having limited maintenance resources, by forecasting spare parts demand precisely and maintaining inventory in good condition. Originality/value – Adopting the approach proposed in the paper, risk level can be minimized and plant availability can be maximized within the financial constraint. The resources are allocated to the most critical components and thereby increased availability, and reduce risk.

[1]  Charles E Ebeling,et al.  An Introduction to Reliability and Maintainability Engineering , 1996 .

[2]  Kim LaScola Needy,et al.  Risk and Spare Parts Inventory in Electric Utilities , 2009 .

[3]  George F. Brown,et al.  A Bayesian approach to demand estimation and inventory provisioning , 1973 .

[4]  R. Watson,et al.  The Effects of Demand-Forecast Fluctuations on Customer Service and Inventory Cost When Demand is Lumpy , 1987 .

[5]  Rommert Dekker,et al.  Inventory control of spare parts using a Bayesian approach: A case study , 1999, Eur. J. Oper. Res..

[6]  R. Fisher,et al.  On the Mathematical Foundations of Theoretical Statistics , 1922 .

[7]  W. J. Kennedy,et al.  An overview of recent literature on spare parts inventories , 2002 .

[8]  Ann Vereecke,et al.  An inventory management model for an inventory consisting of lumpy items, slow movers and fast movers , 1994 .

[9]  Larry George Mathematical Statistics, a Unified Introduction , 2000, Technometrics.

[10]  F.E. Ciarapica,et al.  Spare parts inventory control for the maintenance of productive plants , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.

[11]  Adel A. Ghobbar,et al.  Sources of intermittent demand for aircraft spare parts within airline operations , 2002 .

[12]  C.M. Adams Inventory optimization techniques, system vs. item level inventory analysis , 2004, Annual Symposium Reliability and Maintainability, 2004 - RAMS.

[13]  J.M. Nahman,et al.  Probability Models for Optimal Sparing of Distribution Network Transformers , 2009, IEEE Transactions on Power Delivery.

[14]  J. D. Croston Forecasting and Stock Control for Intermittent Demands , 1972 .

[15]  T. P. M. Pakkala,et al.  A Bayesian approach to a dynamic inventory model under an unknown demand distribution , 2002, Comput. Oper. Res..

[16]  Craig C. Sherbrooke,et al.  Optimal Inventory Modeling of Systems: Multi-Echelon Techniques (INTL SERIES IN OPERATIONS RESEARCH & MANAGEMENT SCIENCE) , 1992 .

[17]  Barnard E. Smith,et al.  A Learning Model for Inventory of Slow-Moving Items , 1969 .

[18]  J Maiti,et al.  Risk-based maintenance--techniques and applications. , 2007, Journal of hazardous materials.

[19]  Jay Lee,et al.  Maintenance: Changing role in life cycle management , 2004 .

[20]  S. C. Choi,et al.  Maximum Likelihood Estimation of the Parameters of the Gamma Distribution and Their Bias , 1969 .

[21]  Alexandre Dolgui,et al.  Demand forecasting for multiple slow-moving items with short requests history and unequal demand variance , 2008 .

[22]  F. Johnston An Interactive Stock Control System with a Strategic Management Role , 1980 .

[23]  Edward A. Silver,et al.  Bayesian Determination of the Reorder Point of a Slow Moving Item , 1965 .

[24]  Jovan Popovic,et al.  Decision making on stock levels in cases of uncertain demand rate , 1987 .

[25]  Jezdimir Knezevic,et al.  Availability based spare optimization using renewal process , 1998 .

[26]  R. Dekker,et al.  A spare parts stocking policy based on equipment criticality , 1998 .

[27]  Sang-Chin Yang,et al.  Criticality evaluation for spare parts initial provisioning , 2004, Annual Symposium Reliability and Maintainability, 2004 - RAMS.

[28]  Hoang Pham,et al.  Springer Handbook of Engineering Statistics , 2023, Springer Handbooks.

[29]  Quey-Jen Yeh A practical implementation of gamma distribution to the reordering decision of an inventory control problem , 1997 .