Uncertainties make construction dynamic and unstable, mostly by creating non value-adding change iterations among construction processes. Particularly, when a project is fast-tracked without proper planning, those change iterations can cause the disruption of the construction process. For this reason, to effectively handle fast-tracking change iterations involved in fast-tracking need to be identified, and the dynamic behavior of construction resulting from those change iterations must be dealt with in a systematic manner. As an effort to address some of these challenging issues in fast-tracking construction, this research paper identifies different change iteration cycles involved in fast-tracking construction and observes the characteristics and behavior patterns of change. All of research findings are incorporated into a cohesive system dynamics model and the model simulation confirms that managerial decisions on change or rework should be made based on the proper assessment of their tradeoff. In addition, a case study of highway and bridge construction projects shows the potential of how fast-tracking construction can benefit from dynamic change management in real world settings.
[1]
O. Moselhi,et al.
Design impact of construction fast-track
,
1988
.
[2]
Joseph J Tighe.
Benefits of fast tracking are a myth
,
1991
.
[3]
Finland,et al.
Fast or concurrent: The art of getting construction improved
,
1997
.
[4]
Gareth Vaughan Williams.
Fast Track Pros and Cons: Considerations for Industrial Projects
,
1995
.
[5]
Moonseo Park.
Robust control of cost impact on fast-tracking building construction projects
,
1999
.
[6]
Moonseo Park.
Dynamic planning and control methodology for large-scale concurrent construction projects
,
2001
.
[7]
David N. Ford,et al.
Dynamic modeling of product development processes
,
1998
.