Site managers’ daily work and the uses of building information modelling in construction site management

The use of building information modelling (BIM) and related software tools is increasingly expanding in the work of site managers in construction projects. The early uses of BIM in the actual tasks of site managers are explored by examining the utilization of BIM in their work and the challenges in the deployment of the new digital tools for traditional project collaboration. The ethnographic method of the study consists of shadowing the site managers’ work. The site managers actively used BIM and found it beneficial for their daily work. However, the use of BIM in construction sites is still limited because only a few managers have the competence to use BIM software tools, mobile tools are lacking, and the information content of the models needed for construction work is insufficient.

[1]  Brad Hardin,et al.  BIM and Construction Management: Proven Tools, Methods, and Workflows , 2009 .

[2]  M. Bresnen,et al.  Where?s the action? Challenges of ethnographic research in construction. , 2013 .

[3]  Seonaidh McDonald,et al.  Studying actions in context: a qualitative shadowing method for organizational research , 2005 .

[4]  Jon Hindmarsh,et al.  Workplace Studies: List of contributors , 2000 .

[5]  S. Barley Images of Imaging: Notes on Doing Longitudinal Field Work , 1990 .

[6]  Davide Nicolini Zooming In and Out: Studying Practices by Switching Theoretical Lenses and Trailing Connections , 2009 .

[7]  Alexander Styhre,et al.  The overworked site manager: gendered ideologies in the construction industry , 2011 .

[8]  Dylan Tutt,et al.  Ethnographic methodologies for construction research: knowing, practice and interventions , 2010 .

[9]  M. Alvesson At-home ethnography: struggling with closeness and closure , 2009 .

[10]  Alex Soojung-Kim Pang On Line and on Paper: Visual Representations, Visual Culture, and Computer Graphics in Design Engineering. Kathryn Henderson , 2001 .

[11]  David Bryde,et al.  The project benefits of Building Information Modelling (BIM) , 2013 .

[12]  Kenneth T. Sullivan,et al.  How To Measure the Benefits of BIM - A Case Study Approach , 2012 .

[13]  Chris Harty,et al.  Implementing ‘Site BIM’: A case study of ICT innovation on a large hospital project , 2013 .

[14]  Yrjö Engeström,et al.  Workplace Studies: From individual action to collective activity and back: developmental work research as an interventionist methodology , 2000 .

[15]  Dvora Yanow,et al.  Re-Turn to Practice: An Introductory Essay , 2009 .

[16]  Hannele Kerosuo,et al.  An activity theoretical approach to BIM-research , 2012 .

[17]  Alexander Styhre,et al.  Organization Learning in Non-writing Communities , 2006 .

[18]  Campbell Fraser,et al.  The influence of personal characteristics on effectiveness of construction site managers , 2000 .

[19]  Bilal Succar,et al.  Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .

[20]  Y. Engeström,et al.  Expansive Learning at Work: Toward an activity theoretical reconceptualization , 2001 .

[21]  A. Matzger Where's the Action? , 1971, California medicine.

[22]  Alexander Styhre,et al.  Revisiting site manager work: stuck in the middle? , 2006 .

[23]  Dvora Yanow,et al.  Organizational ethnography : studying the complexities of everyday life , 2009 .

[24]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[25]  Alexander Styhre Leadership as muddling through: Site managers in the construction industry , 2012 .

[26]  Alexander Styhre,et al.  In the circuit of credibility: construction workers and the norms of ‘a good job’ , 2011 .

[27]  Jon Hindmarsh,et al.  Workplace Studies: Exploring the workplace , 2000 .

[28]  Louis L. Bucciarelli,et al.  An ethnographic perspective on engineering design , 1988 .

[29]  S. Tengblad,et al.  The Work of Managers: Towards a Practice Theory of Management , 2012 .

[30]  Weisheng Lu,et al.  Rethinking project management and exploring virtual design and construction as a potential solution , 2009 .

[31]  Carrie Sturts Dossick,et al.  Messy talk and clean technology: communication, problem-solving and collaboration using Building Information Modelling , 2011 .

[32]  Henry Mintzberg Structured Observation as a Method to Study Managerial Work , 1970, Managerial Work.

[33]  Chris Harty,et al.  Emerging Hybrid Practices in Construction Design Work: Role of Mixed Media , 2010 .

[34]  Where's the Action? , 1984 .

[35]  Jon Prosser,et al.  What is Visual Methods , 2010 .

[36]  E. Rogers,et al.  Diffusion of innovations , 1964, Encyclopedia of Sport Management.

[37]  Kathryn Henderson,et al.  On Line and On Paper: Visual Representations, Visual Culture, and Computer Graphics in Design Engineering , 1998 .

[38]  Alexander Styhre,et al.  The bureaucratization of the project manager function: The case of the construction industry , 2006 .

[39]  Hannele Kerosuo Boundaries in Action : An Activity-theoretical Study of Development, Learning, and Change in Health Care Organization for Patients with Multiple and Chronic Illnesses , 2006 .

[40]  Barbara Czarniawska Shadowing: And Other Techniques for Doing Fieldwork in Modern Societies , 2007 .

[41]  Carrie Sturts Dossick,et al.  Organizational Divisions in BIM-Enabled Commercial Construction , 2010 .