How to carry out assembly line–cell conversion? A discussion based on factor analysis of system performance improvements

The line–cell (or line–seru) conversion is an innovation of assembly systems that has received less attention. Its essence is dismantling an assembly conveyor line and adopting a mini-assembly unit, called seru (or cell). In this paper, we discuss how to do such line–cell conversions, especially focusing on assembly cell formation (ACF) and assembly cell loading (ACL). We perform 64 arrays of full factorial experiment analysis that incorporate three factors: work stations, product types, and product lot sizes. We construct a two-objective line–cell conversion model that minimises the total throughput time (TTPT) and the total labour hours (TLH). Three non-dominated solutions obtained from the two-objective model are used to evaluate the performance of the line–cell conversion. By investigating the experimental results of the ACF and the ACL, we summarise several managerial insights that could be used to help successful line–cell conversions.

[1]  Dario Ikuo Miyake The Shift from Belt Conveyor Line to Work-cell Based Assembly Systems to Cope with Increasing Demand Variation and Fluctuation in The Japanese Electronics Industries , 2006 .

[2]  Ezey M. Dar-El,et al.  Team-oriented assembly system design: A new approach , 1997 .

[3]  Yu Sakazume,et al.  Is Japanese Cell Manufacturing a New System? : A Comparative Study between Japanese Cell Manufacturing and Cellular Manufacturing( Production and Logistics) , 2004 .

[4]  Ikou Kaku,et al.  A Mathematical Model for Converting Conveyor Assembly Line to Cellular Manufacturing , 2008 .

[5]  Yong Yin,et al.  The Evolution of Seru Production Systems Throughout Canon , 2008 .

[6]  Danny J. Johnson,et al.  Converting assembly lines to assembly cells at sheet metal products: insights on performance improvements , 2005 .

[7]  Ikou Kaku,et al.  Modeling and numerical analysis of line-cell conversion problems , 2009 .

[8]  Eric F. Wood,et al.  Multiobjective Decision Analysis With Engineering and Business Applications , 1983 .

[9]  Richard M. Karp,et al.  Reducibility Among Combinatorial Problems , 1972, 50 Years of Integer Programming.

[10]  Yong Yin,et al.  A study on human-task-related performances in converting conveyor assembly line to cellular manufacturing , 2008 .

[11]  Ikou Kaku,et al.  Seru: The Organizational Extension of JIT for a Super-Talent Factory , 2012, Int. J. Strateg. Decis. Sci..

[12]  Katsuhide Isa,et al.  Cell Production and Workplace Innovation in Japan: Toward a New Model for Japanese Manufacturing? , 2002 .

[13]  John L. Burbidge,et al.  Production flow analysis , 1963 .

[14]  F. R. Jacobs,et al.  Impact of work teams: a comparison study of assembly cells and assembly line for a variety of operating environments , 2004 .

[15]  Simon French,et al.  Multi-Objective Decision Analysis with Engineering and Business Applications , 1983 .

[16]  Yong Yin,et al.  Seru Seisan‐ an innovation of the production management Mode in Japan , 2010 .

[17]  Dario Ikuo Miyake,et al.  The shift from belt conveyor line to work-cell based assembly systems to cope with increasing demand variation in Japanese industries , 2006 .

[18]  Martin Klazar,et al.  Bell numbers, their relatives, and algebraic differential equations , 2003, J. Comb. Theory, Ser. A.