Cost Minimizing Single Sampling Plans with AIQL and AOQL Constraints
暂无分享,去创建一个
This paper investigates and formulates the relationships among average incoming quality limit (AIQL), production process quality level and average fraction defective after production process for a single-stage manufacturing connected-unit situation. Cost components of the system are identified. In order to derive minimum cost single sampling plans where inspection is by attribute, a mathematical model is developed and plans are obtained using discrete optimization for the total expected loss function subject to AIQL and AOQL equality constraints.
[1] L. G. Mitten,et al. Design of an Optimal Sequence of Interrelated Sampling Plans , 1964 .
[2] Harvey J. Everett. Generalized Lagrange Multiplier Method for Solving Problems of Optimum Allocation of Resources , 1963 .
[3] M. Johns,et al. Bayes Acceptance Sampling Procedures for Large Lots , 1959 .