Multitask and Multistage Production Planning and Scheduling for Process Industries
暂无分享,去创建一个
[1] C. Pantelides,et al. Optimal Campaign Planning/Scheduling of Multipurpose Batch/Semicontinuous Plants. 1. Mathematical Formulation , 1996 .
[2] G. Reklaitis,et al. Continuous Time Representation Approach to Batch and Continuous Process Scheduling. 1. MINLP Formulation , 1999 .
[3] Bezalel Gavish,et al. Optimal Lot-Sizing Algorithms for Complex Product Structures , 1986, Oper. Res..
[4] Ignacio E. Grossmann,et al. Disjunctive multiperiod optimization methods for design and planning of chemical process systems , 1999 .
[5] Hans-Otto Günther,et al. Advanced planning and scheduling solutions in process industry , 2003 .
[6] Laurence A. Wolsey,et al. MIP modelling of changeovers in production planning and scheduling problems , 1997 .
[7] C. Floudas,et al. Effective Continuous-Time Formulation for Short-Term Scheduling. 1. Multipurpose Batch Processes , 1998 .
[8] J. K. Lenstra,et al. Deterministic Production Planning: Algorithms and Complexity , 1980 .
[9] R. Sargent,et al. A general algorithm for short-term scheduling of batch operations—II. Computational issues , 1993 .
[10] Thomas L. Magnanti,et al. A Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs , 1990, Oper. Res..
[11] R. Sargent,et al. The optimal operation of mixed production facilities—a general formulation and some approaches for the solution , 1996 .
[12] Kumar Rajaram,et al. Grade Selection and Blending to Optimize Cost and Quality , 2001, Oper. Res..
[13] X. Zhu,et al. A Novel Continuous-Time MILP Formulation for Multipurpose Batch Plants. 1. Short-Term Scheduling , 2001 .
[14] Gintaras V. Reklaitis,et al. Issues in the use, design and evolution of process scheduling and planning systems , 1997 .
[15] Martin W. P. Savelsbergh,et al. A multi-item production planning model with setup times: algorithms, reformulations, and polyhedral characterizations for a special case , 2003, Math. Program..
[16] Hartmut Stadtler,et al. Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows , 2003, Oper. Res..
[17] I. Grossmann,et al. Reformulation of multiperiod MILP models for planning and scheduling of chemical processes , 1991 .
[18] Herbert E. Scarf,et al. Optimal Policies for a Multi-Echelon Inventory Problem , 1960, Manag. Sci..
[19] Laurence A. Wolsey,et al. Multi-item lot-sizing problems using strong cutting planes , 1991 .
[20] Laurence A. Wolsey,et al. Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation , 2002, Manag. Sci..
[21] Laurence A. Wolsey,et al. Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs , 2001, Manag. Sci..
[22] Gintaras V. Reklaitis,et al. A DECOMPOSITION HEURISTIC FOR SCHEDULING THE GENERAL BATCH CHEMICAL PLANT , 1997 .
[23] Laurence A. Wolsey,et al. Tight Mip Formulation for Multi-Item Discrete Lot-Sizing Problems , 2003, Oper. Res..
[24] G. Bitran,et al. Computational Complexity of the Capacitated Lot Size Problem , 1982 .
[25] C. Pantelides,et al. A simple continuous-time process scheduling formulation and a novel solution algorithm , 1996 .
[26] Uday S. Karmarkar,et al. The Deterministic Dynamic Product Cycling Problem , 1985, Oper. Res..
[27] Laurence A. Wolsey,et al. Strong Formulations for Multi-Item Capacitated Lot Sizing , 1984 .
[28] Klaus Neumann,et al. Advanced production scheduling for batch plants in process industries , 2002, OR Spectr..
[29] S. Benjaafar,et al. Multi-Task / Multi-Stage Production Planning and Scheduling for Process Industries , 2006 .
[30] Ignacio E. Grossmann,et al. New General Continuous-Time State−Task Network Formulation for Short-Term Scheduling of Multipurpose Batch Plants , 2003 .
[31] Laurence A. Wolsey,et al. bc -- prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems , 2000 .
[32] Christodoulos A. Floudas,et al. Continuous-Time Optimization Approach for Medium-Range Production Scheduling of a Multiproduct Batch Plant , 2002 .
[33] Joseph F. Pekny,et al. Algorithm architectures to support large-scale process systems engineering applications involving combinatorics, uncertainty, and risk management , 2002 .
[34] H. Tempelmeier,et al. A Lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times , 1996 .
[35] Miguel Constantino,et al. A cutting plane approach to capacitated lot-sizing with start-up costs , 1996, Math. Program..
[36] E. Arkin,et al. Computational complexity of uncapacitated multi-echelon production planning problems , 1989 .
[37] Ignacio E. Grossmann,et al. Minimization of the Makespan with a Discrete-Time State−Task Network Formulation , 2003 .
[38] C. Pantelides,et al. Optimal Campaign Planning/Scheduling of Multipurpose Batch/Semicontinuous Plants. 2. A Mathematical Decomposition Approach , 1996 .
[39] Terry P. Harrison,et al. Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources , 1998 .
[40] Alper Atamtürk,et al. A study of the lot-sizing polytope , 2004, Math. Program..
[41] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[42] S. Engell,et al. Planning and Scheduling in the Process Industry , 2022 .
[43] R. Sargent,et al. A general algorithm for short-term scheduling of batch operations */I , 1993 .