광양항 컨테이너터미널의 장비 작업계획 우선순위 분석
暂无分享,去创建一个
This paper is concerned about applying the AHP(Analytic Hierarchy Process) for a priority analysis of equipment operation plan to improve productivity of the container terminal in Gwangyang port. In this study, main elements of container terminal are assumed as into yard equipment area, transport equipment area, berth equipment area and C/Center area. A questionnaire is used to collect the opinions of equipment operating department and operational planning department. On the whole, the result of the analyses reveals that the most important area is yard equipment area. Examining each department is responses, equipment operating department preferred the C/Center area to other areas, on the other hand, operational planning department preferred yard equipment area. The result of this study suggests some guidelines for deciding priority of operation plan in the container terminal.