Uncertainty in the life cycle assessment of building emissions: A comparative case study of stochastic approaches

Abstract Life cycle assessment of buildings has become popular recently, due to the significant potential of emission reduction. Previous studies have contributed much to the quantification of emissions, yet the issue of uncertainties needs to be further investigated. In general, the uncertainty in life cycle assessment is mainly due to the errors in input parameters, definition of system boundary and scenario assumptions, and choice of analytical models, which could be summarized as parameter, scenario, and model uncertainties. In the present study, data quality indicators were adopted and a semi-quantitative method was modeled accordingly, relevant to the uncertainty analysis of building emission assessment. A case study building was analyzed comparing the deterministic and stochastic approaches, and the results indicate that the uncertainty in input parameters could result in a standard deviation of 3106 tCO2e for the sample mean of 61504 tCO2e, which is in line with the deterministic results. Further scenario analyses investigated the influence of scenario and modelling alternatives. Relevant results emphasized the definition of system boundary and energy efficiency to control uncertainties, and suggested applying statistical distribution for key parameters in analysis. Overall, the present study could provide useful information on the uncertainty of life cycle emission assessment, and, therefore, be helpful in decision-making regarding the low-carbon development of building industry.

[1]  Olivier Jolliet,et al.  Analytical uncertainty propagation in life cycle inventory and impact assessment: application to an automobile front panel , 2010 .

[2]  Guido Sonnemann,et al.  Uncertainty assessment by a Monte Carlo simulation in a life cycle inventory of electricity produced by a waste incinerator , 2003 .

[3]  Geoffrey Qiping Shen,et al.  Uncertainty analysis for measuring greenhouse gas emissions in the building construction phase: a case study in China , 2016 .

[4]  H. S. Matthews,et al.  Uncertainty analysis of life cycle greenhouse gas emissions from petroleum-based fuels and impacts on low carbon fuel policies. , 2011, Environmental science & technology.

[5]  Z. Li,et al.  Inventory and input-output analysis of CO2 emissions by fossil fuel consumption in Beijing 2007 , 2012, Ecol. Informatics.

[6]  Dz Z. Li,et al.  A methodology for estimating the life-cycle carbon efficiency of a residential building , 2013 .

[7]  Gjalt Huppes,et al.  Methods for Life Cycle Inventory of a product , 2005 .

[8]  Xu Zhang,et al.  A detailed analysis of the embodied energy and carbon emissions of steel-construction residential buildings in China , 2016 .

[9]  Stefanie Hellweg,et al.  Using Standard Statistics to Consider Uncertainty in Industry-Based Life Cycle Inventory Databases (7 pp) , 2005 .

[10]  Adem Atmaca,et al.  Life cycle energy (LCEA) and carbon dioxide emissions (LCCO2A) assessment of two residential buildings in Gaziantep, Turkey , 2015 .

[11]  Ya Hong Dong,et al.  Comparing carbon emissions of precast and cast-in-situ construction methods – A case study of high-rise private building , 2015 .

[12]  David J. Brennan,et al.  Application of data quality assessment methods to an LCA of electricity generation , 2003 .

[13]  F. Gao,et al.  Life Cycle Energy Consumption and Carbon Dioxide Emission of Residential Building Designs in Beijing , 2012 .

[14]  Zeng-zhong Wang,et al.  Life-cycle assessment of CO2 emissions of buildings , 2011, 2011 International Conference on Remote Sensing, Environment and Transportation Engineering.

[15]  John Holmberg,et al.  Direct and indirect energy use and carbon emissions in the production phase of buildings: An input-output analysis , 2007 .

[16]  Janko Hodolic,et al.  Fuzzy multi-criteria-based impact category weighting in life cycle assessment , 2016 .

[17]  Joseph H. M. Tah,et al.  Mathematical modelling of embodied energy, greenhouse gases, waste, time–cost parameters of building projects: A review , 2013 .

[18]  Douglas C. Montgomery,et al.  Data quality , 1996 .

[19]  M. Huijbregts,et al.  Evaluating uncertainty in environmental life-cycle assessment. A case study comparing two insulation options for a Dutch one-family dwelling. , 2003, Environmental science & technology.

[20]  Jingzheng Ren,et al.  Life cycle energy and CO2 emission optimization for biofuel supply chain planning under uncertainties , 2016 .

[21]  Bo Wang,et al.  Research on the life-cycle CO2 emission of China's construction sector , 2016 .

[22]  Jose L. Fernandez-Solis,et al.  System boundary for embodied energy in buildings: A conceptual model for definition , 2013 .

[23]  Carlos Martín Sastre,et al.  Global warming and energy yield evaluation of Spanish wheat straw electricity generation – A LCA that takes into account parameter uncertainty and variability , 2015 .

[24]  Manfred Lenzen,et al.  Life cycle energy and greenhouse gas emissions of nuclear energy: A review , 2008 .

[25]  Ben Amor,et al.  Recent developments, future challenges and new research directions in LCA of buildings: A critical review , 2017 .

[26]  Maurizio Cellura,et al.  Sensitivity analysis to quantify uncertainty in Life Cycle Assessment: The case study of an Italian tile , 2011 .

[27]  Sarel Lavy,et al.  Need for an embodied energy measurement protocol for buildings: A review paper , 2012 .

[28]  Pascal Lesage,et al.  The application of the pedigree approach to the distributions foreseen in ecoinvent v3 , 2016, The International Journal of Life Cycle Assessment.

[29]  William W. Braham,et al.  Uncertainty characterization of building emergy analysis (BEmA) , 2015 .

[30]  Robert Ries,et al.  The embodied air pollutant emissions and water footprints of buildings in China: a quantification using disaggregated input–output life cycle inventory model , 2016 .

[31]  Bo Pedersen Weidema,et al.  Data quality management for life cycle inventories—an example of using data quality indicators☆ , 1996 .

[32]  Louise Deschênes,et al.  Analytical Propagation of Uncertainty in Life Cycle Assessment Using Matrix Formulation , 2013 .

[33]  Adolf Acquaye,et al.  Stochastic hybrid embodied CO 2-eq analysis: An application to the Irish apartment building sector , 2011 .

[34]  M Guo,et al.  LCA data quality: sensitivity and uncertainty analysis. , 2012, The Science of the total environment.

[35]  Manfred Lenzen,et al.  Errors in Conventional and Input‐Output—based Life—Cycle Inventories , 2000 .

[36]  Jiaping Liu,et al.  Embodied carbon emissions of office building: A case study of China's 78 office buildings , 2016 .

[37]  Dominique Guyonnet,et al.  Quantifying uncertainty in LCA-modelling of waste management systems. , 2012, Waste management.

[38]  H Scott Matthews,et al.  Categorization of Scope 3 emissions for streamlined enterprise carbon footprinting. , 2009, Environmental science & technology.

[39]  Jun Guan,et al.  Quantification of building embodied energy in China using an input–output-based hybrid LCA model , 2016 .

[40]  Ke Sun,et al.  Developing a meta-model for sensitivity analyses and prediction of building performance for passively designed high-rise residential buildings , 2017 .

[41]  Qiping Shen,et al.  Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: Two case studies of residential projects , 2013 .

[42]  Xiaocun Zhang,et al.  Hybrid input-output analysis for life-cycle energy consumption and carbon emissions of China’s building sector , 2016 .

[43]  S. Setunge,et al.  Models and method for estimation and comparison of direct emissions in building construction in Australia and a case study , 2016 .

[44]  Barbara C. Lippiatt,et al.  Framework for hybrid life cycle inventory databases: a case study on the Building for Environmental and Economic Sustainability (BEES) database , 2012, The International Journal of Life Cycle Assessment.

[45]  Yongjun Sun,et al.  Uncertainty-based life-cycle analysis of near-zero energy buildings for performance improvements , 2018 .

[46]  Seppo Junnila,et al.  Pre-use phase LCA of a multi-story residential building: Can greenhouse gas emissions be used as a more general environmental performance indicator? , 2016 .

[47]  Göran Finnveden,et al.  Data quality of life cycle inventory data — rules of thumb , 1998 .

[48]  Fenglai Wang,et al.  Life-cycle assessment and control measures for carbon emissions of typical buildings in China , 2015 .

[49]  Javier Ribal,et al.  Consequential LCA of two alternative systems for biodiesel consumption in Spain, considering uncertainty. , 2014 .

[50]  Tasawar Hayat,et al.  Systems accounting for energy consumption and carbon emission by building , 2014, Commun. Nonlinear Sci. Numer. Simul..

[51]  Endong Wang,et al.  A hybrid Data Quality Indicator and statistical method for improving uncertainty analysis in LCA of complex system – application to the whole-building embodied energy analysis , 2013 .

[52]  Xiaocun Zhang,et al.  Assessment of embodied carbon emissions for building construction in China: Comparative case studies using alternative methods , 2016 .

[53]  Robert H. Crawford Towards a comprehensive approach to zero-emissions housing , 2011 .

[54]  Yanpeng Cai,et al.  A hybrid life-cycle and fuzzy-set-pair analyses approach for comprehensively evaluating impacts of industrial wastewater under uncertainty , 2014 .

[55]  Stefanie Hellweg,et al.  Uncertainty Analysis in Life Cycle Assessment (LCA): Case Study on Plant-Protection Products and Implications for Decision Making (9 pp + 3 pp) , 2005 .

[56]  Yimin Zhu,et al.  An assessment framework for analyzing the embodied carbon impacts of residential buildings in China , 2014 .

[57]  Ming Cheung,et al.  Carbon reduction in a high-density city: A case study of Langham Place Hotel Mongkok Hong Kong , 2013 .

[58]  Pieter de Wilde,et al.  A review of uncertainty analysis in building energy assessment , 2018, Renewable and Sustainable Energy Reviews.

[59]  Arturo A. Keller,et al.  Critical Components of Uncertainty Communication in Life Cycle Assessments of Emerging Technologies , 2015 .

[60]  Murat Kucukvar,et al.  Scope-based carbon footprint analysis of U.S. residential and commercial buildings: An input–output hybrid life cycle assessment approach , 2014 .

[61]  Joule A. Bergerson,et al.  Incorporation of electricity GHG emissions intensity variability into building environmental assessment , 2015 .

[62]  Vilas Nitivattananon,et al.  Exercising multidisciplinary approach to assess interrelationship between energy use, carbon emission and land use change in a metropolitan city of Pakistan , 2012 .

[63]  Yuhang Li,et al.  Life cycle inventory comparison of different building insulation materials and uncertainty analysis , 2016 .

[64]  Troy R. Hawkins,et al.  Hybrid Framework for Managing Uncertainty in Life Cycle Inventories , 2009 .

[65]  Ambrose Dodoo,et al.  Lifecycle carbon implications of conventional and low-energy multi-storey timber building systems , 2014 .

[66]  Fenglai Wang,et al.  Life-cycle carbon emission assessment and permit allocation methods: A multi-region case study of China’s construction sector , 2017 .

[67]  Yu Chun-long Discussions on Different Distract Heating Sources , 2010 .

[68]  Leif Gustavsson,et al.  Life cycle primary energy use and carbon emission of an eight-storey wood-framed apartment building , 2010 .

[69]  Hun Hee Cho,et al.  Statistical analysis of embodied carbon emission for building construction , 2015 .

[70]  Jingzheng Ren,et al.  Life cycle aggregated sustainability index for the prioritization of industrial systems under data uncertainties , 2018, Comput. Chem. Eng..

[71]  Jui-Sheng Chou,et al.  Life cycle carbon dioxide emissions simulation and environmental cost analysis for building construction , 2015 .

[72]  T. Nemecek,et al.  Overview and methodology: Data quality guideline for the ecoinvent database version 3 , 2013 .

[73]  Gjalt Huppes,et al.  System boundary selection in life-cycle inventories using hybrid approaches. , 2004, Environmental science & technology.

[74]  Alessandra La Notte,et al.  Assessing direct and indirect emissions of greenhouse gases in road transportation, taking into account the role of uncertainty in the emissions inventory , 2018 .

[75]  Xiaocun Zhang,et al.  Stochastic analysis of embodied emissions of building construction: A comparative case study in China , 2017 .

[76]  Douglas C. Montgomery,et al.  Screening stochastic Life Cycle assessment inventory models , 2002 .

[77]  Ricardo Enríquez,et al.  Quantification of the uncertainties produced in the construction process of a building through simulation tools: A case study , 2018, Journal of Building Engineering.

[78]  B. W. Ang,et al.  Input–output analysis of CO2 emissions embodied in trade: The effects of spatial aggregation , 2010 .

[79]  Andreas Ciroth,et al.  Geographical and technological differences in life cycle inventories shown by the use of process models for waste incinerators part I. technological and geographical differences , 2002 .

[80]  Seppo Junnila,et al.  A scenario analysis of the life cycle greenhouse gas emissions of a new residential area , 2012 .

[81]  Xiaocun Zhang,et al.  Analysis of embodied carbon in the building life cycle considering the temporal perspectives of emissions: A case study in China , 2017 .

[82]  F. Shi,et al.  Structural decomposition analysis of the carbonization process in Beijing: A regional explanation of rapid increasing carbon dioxide emission in China , 2013 .

[83]  H. Scott Matthews,et al.  Representing and visualizing data uncertainty in input-output life cycle assessment models , 2018, Resources, Conservation and Recycling.

[84]  M. Corson,et al.  Influence of emission-factor uncertainty and farm-characteristic variability in LCA estimates of environmental impacts of French dairy farms , 2014 .

[85]  W. K. Hui,et al.  Assessment of CO2 emissions reduction in high-rise concrete office buildings using different material use options , 2012 .