Interval optimal scheduling of hydro-PV-wind hybrid system considering firm generation coordination
暂无分享,去创建一个
[1] Fang-Fang Li,et al. Multi-objective reservoir optimization balancing energy generation and firm power , 2015 .
[2] Joao P. S. Catalao,et al. Optimal Wind Reversible Hydro Offering Strategies for Midterm Planning , 2015, IEEE Transactions on Sustainable Energy.
[3] Giri Venkataramanan,et al. Generation unit sizing and cost analysis for stand-alone wind, photovoltaic, and hybrid wind/PV systems , 1998 .
[4] Tapan Kumar Pal,et al. On comparing interval numbers , 2000, Eur. J. Oper. Res..
[5] M. Shahidehpour,et al. Risk-Constrained Coordination of Cascaded Hydro Units With Variable Wind Power Generation , 2012, IEEE Transactions on Sustainable Energy.
[6] Chuanwen Jiang,et al. Coordination of hydro units with wind power generation based on RAROC , 2015 .
[7] Stavros A. Papathanassiou,et al. Operating Policies for Wind-Pumped Storage Hybrid Power Stations in Island Grids , 2009 .
[8] A. Fabbri,et al. Assessment of the cost associated with wind generation prediction errors in a liberalized electricity market , 2005, IEEE Transactions on Power Systems.
[9] Stefanos V. Papaefthymiou,et al. A Wind-Hydro-Pumped Storage Station Leading to High RES Penetration in the Autonomous Island System of Ikaria , 2010, IEEE Transactions on Sustainable Energy.
[10] G. Gutierrez-Alcaraz,et al. Multi-objective expansion planning approach: distant wind farms and limited energy resources integration , 2013 .
[11] Swapan Kumar Goswami,et al. Impact of load management on the energy management strategy of a wind-short hydro hybrid system in frequency based pricing , 2014 .
[12] Lei Wu,et al. Optimal coordination of wind-hydro-thermal based on water complementing wind , 2013 .
[13] Mohammad Shahidehpour,et al. Transmission-constrained intrahour coordination of wind and pumped-storage hydro units , 2013 .
[14] Horacio Perez-Blanco,et al. Computing Gas Turbine Fuel Consumption to Firm Up Wind Power , 2012 .
[15] M. Shahidehpour,et al. GENCO's Risk-Constrained Hydrothermal Scheduling , 2008, IEEE Transactions on Power Systems.
[16] Antonio J. Conejo,et al. Self-Scheduling of a Hydro Producer in a Pool-Based Electricity Market , 2002, IEEE Power Engineering Review.
[17] J. I. Muñoz,et al. Optimal coordinated wind-hydro bidding strategies in day-ahead markets , 2013, IEEE Transactions on Power Systems.
[18] O. A. Jaramillo,et al. Using hydropower to complement wind energy: a hybrid system to provide firm power , 2004 .
[19] Arild Helseth,et al. A model for optimal scheduling of hydro thermal systems including pumped-storage and wind power , 2013 .
[20] I. G. Moghaddam,et al. Risk-averse profit-based optimal operation strategy of a combined wind farm–cascade hydro system in an electricity market , 2013 .
[21] Yang Wang,et al. Unit Commitment With Volatile Node Injections by Using Interval Optimization , 2011, IEEE Transactions on Power Systems.
[22] Swagatam Das,et al. Modified Differential Evolution with Locality induced Genetic Operators for dynamic optimization , 2016, Eur. J. Oper. Res..
[23] Chuanwen Jiang,et al. Coordination of Hydro Units With Wind Power Generation Using Interval Optimization , 2015, IEEE Transactions on Sustainable Energy.
[24] A. Traca-de-Almeida,et al. Source Reliability in a Combined Wind-Solar-Hydro System , 1983, IEEE Power Engineering Review.
[25] Djangir A. Babayev. Piece-wise linear approximation of functions of two variables , 1997, J. Heuristics.
[26] M.E.P. Maceira,et al. A Four-Dimensional Model of Hydro Generation for the Short-Term Hydrothermal Dispatch Problem Considering Head and Spillage Effects , 2008, IEEE Transactions on Power Systems.
[27] Kalyanmoy Deb,et al. Dynamic multiobjective optimization problems: test cases, approximations, and applications , 2004, IEEE Transactions on Evolutionary Computation.