Heuristics for solving disassemble-to-order problems with stochastic yields
暂无分享,去创建一个
[1] M. Toffel. The Growing Strategic Importance of End-of-Life Product Management , 2003, IEEE Engineering Management Review.
[2] Surendra M. Gupta,et al. Disassembly of multiple product structures , 1997 .
[3] V. Daniel R. Guide,et al. The Reverse Supply Chain , 2002 .
[4] K. Peattie,et al. Meeting the Closed-Loop Challenge: The Case of Remanufacturing , 2004 .
[5] J. Stock,et al. MANY HAPPY (PRODUCT) RETURNS , 2002 .
[6] Ieke le Blanc,et al. Product Modularity and the Design of Closed-Loop Supply Chains , 2004 .
[7] V. Daniel R. Guide,et al. Building contingency planning for closed-loop supply chains with product recovery , 2003 .
[8] P. Xirouchakis,et al. Disassembly Scheduling with Multiple Product Types , 2003 .
[9] Madhav V. Rajan,et al. Cost Accounting: A Managerial Emphasis , 1972 .
[10] M. Toffel. Strategic Management of Product Recovery , 2004 .
[11] R. Dekker,et al. A Framework for Reverse Logistics , 2003 .
[12] Karl Inderfurth,et al. An approach for solving disassemble-to-order problems under stochastic yields , 2004 .
[13] M. D. Brito,et al. Managing reverse logistics or reversing logistics management , 2004 .
[14] Surendra M. Gupta,et al. ANALYSIS OF DESIGN EFFICIENCY FOR THE DISASSEMBLY OF MODULAR ELECTRONIC PRODUCTS , 1999 .
[15] Alfred J.D. Lambert,et al. Demand-driven disassembly optimization for electronic products , 2002 .
[16] Marc Salomon,et al. Strategic Issues in Product Recovery Management , 1995 .
[17] Reha Uzsoy,et al. Experimental Evaluation of Heuristic Optimization Algorithms: A Tutorial , 2001, J. Heuristics.
[18] W. C. Benton,et al. Supply-Chain Management for Recoverable Manufacturing Systems , 2000, Interfaces.
[19] Brian K. Thorn,et al. Take it back , 2002 .
[20] Surendra M. Gupta,et al. Disassembly of complex product structures with parts and materials commonality , 1997 .
[21] P. Xirouchakis,et al. Disassembly scheduling: Integer programming models , 2004 .
[22] R. Dekker,et al. Reverse logistics : quantitative models for closed-loop supply chains , 2004 .
[23] Hau L. Lee,et al. Lot Sizing with Random Yields: A Review , 1995, Oper. Res..
[24] E. A. Silver,et al. An overview of heuristic solution methods , 2004, J. Oper. Res. Soc..
[25] Ian M. Langella. Heuristics for demand-driven disassembly planning , 2007, Comput. Oper. Res..
[26] V. Guide. Production planning and control for remanufacturing: industry practice and research needs , 2000 .
[27] Michael E. Porter,et al. Green and Competitive : Ending the Stalemate , 1996 .
[28] F. Reinhardt. Bringing the environment down to earth. , 1999, Harvard business review.
[29] Dong-Ho Lee,et al. A two-stage heuristic for disassembly scheduling with assembly product structure , 2004, J. Oper. Res. Soc..