You Cannot Manage What You Cannot Measure: An Information Systems Based Asset Management Perspective

Measuring the impact of implementation of information systems for asset management is a complex issue; due to the stochastic nature of process variables, substantial effects of information systems on the way users embrace these systems and consequently execute the business processes, and the high expectations that asset managing businesses associate with the use of information systems. This complexity can partly be attributed to the technology push strategy, rather than technology pull strategy, that asset managing businesses adopt to introduce information systems in to the business. Therefore, in order to take optimum advantage of information systems with regards to process efficiency, effective control, and management, it is important to have effective measurement mechanisms that help managers to measure Information systems utilisation for asset management process. This paper presents a measurement framework that assesses the impact of information systems at each stage of asset lifecycle management. The proposed framework based on generative learning, such that it examines the interpretation of asset management strategy through the use of information systems within the business and its assessment provides for strategic indicators for recalibration of asset management strategy as well as highlights the roadmap for future technology investments. This assessment allows for asset management processes and their stakeholders to adopt a technology pull strategy, which provides the strategic fit between processes and technology; thereby allowing the business to leverage optimum advantage of technology through rationalized investments.

[1]  C. Richard Cassady,et al.  Selective maintenance modeling for industrial systems , 2001 .

[2]  Andy Koronios,et al.  ICT Based Asset Management Framework , 2005, ICEIS.

[3]  G. S. Dangayach,et al.  Manufacturing strategy: Literature review and some issues , 2001 .

[4]  Terry Wireman Total Productive Maintenance , 2004 .

[5]  Andy Neely,et al.  Getting the measure of your business , 2002 .

[6]  Waldemar Karwowski,et al.  Causes and safety effects of production disturbances in FMS installations: A comparison of field survey studies in the USA and Finland , 1996 .

[7]  Amrik S. Sohal,et al.  Integrated management system:the experiences of three Australian organisations , 2005 .

[8]  C. Argyris Double Loop Learning in Organizations , 1996 .

[9]  Waldemar Karwowski,et al.  The occupational ergonomics handbook , 2006 .

[10]  Kepa Mendibil,et al.  Measuring and managing performance in extended enterprises , 2005 .

[11]  Marly Monteiro de Carvalho,et al.  Changing product development process through information technology: a Brazilian case , 2005 .

[12]  F. C. Santos,et al.  Integration of human resource management and competitive priorities of manufacturing strategy , 2000 .

[13]  T. Husband,et al.  Maintenance management and terotechnology , 1976 .

[14]  H. Yamashina,et al.  Challenge to world‐class manufacturing , 2000 .

[15]  Stephen Gibb,et al.  Learning and development: process, practices and perspectives at work , 2002 .

[16]  R. Kaplan,et al.  The Balanced Scorecard: Translating Strategy into Action , 1996 .

[17]  Ian Hipkin Knowledge and IS implementation: case studies in physical asset management , 2001 .

[18]  Tokutaro Suzuki TPM in Process Industries , 1994 .

[19]  Sunday Ayoola Oke,et al.  An analytical model for the optimisation of maintenance profitability , 2005 .

[20]  Umit S. Bititci,et al.  Dynamics of performance measurement systems , 2000, APMS.

[21]  Stefan Tangen,et al.  Performance measurement: from philosophy to practice , 2004 .

[22]  Patrik Jonsson,et al.  The implications of fit between planning environments and manufacturing planning and control methods , 2003 .

[23]  Alex H. B. Duffy,et al.  Modelling design development performance , 2002 .

[24]  Robert Adams,et al.  Quality Social Work , 1998 .

[25]  S I Abdul Raouf Productivity enhancement using safety and maintenance integration , 2004 .

[26]  Benjamin S. Blanchard,et al.  Logistics engineering and management , 1986 .

[27]  Basim Al-Najjar,et al.  Total quality maintenance: An approach for continuous reduction in costs of quality products , 1996 .

[28]  Frank Bannister,et al.  The effective measurement and management of ICT costs and benefits. 3rd edition. , 2007 .

[29]  C. Gopinath,et al.  LINKING COMPETITIVE STRATEGY AND MANUFACTURING PROCESS TECHNOLOGY , 1995 .

[30]  Salih O. Duffuaa,et al.  A generic conceptual simulation model for maintenance systems , 2001 .

[31]  K. Ramamurthy,et al.  Moderating influences of organizational attitude and compatibility on implementation success from computer-integrated manufacturing technology , 1994 .

[32]  A. Neely,et al.  The performance prism perspective , 2001 .

[33]  Albert H. C. Tsang,et al.  TPM implementation in China: a case study , 2000 .

[34]  Abdul Raouf,et al.  Planning and Control of Maintenance Systems: Modeling and Analysis , 1998 .

[35]  Jens Ove Riis,et al.  The interactive firm – towards a new paradigm , 2005 .

[36]  Benjamin S. Blanchard An enhanced approach for implementing total productive maintenance in the manufacturing environment , 1994 .

[37]  Subhash Mathew Optimal inspection frequency , 2004 .

[38]  Risto Kuivanen Disturbance control in flexible manufacturing , 1996 .

[39]  Chris Argyris,et al.  Knowledge for Action: A Guide to Overcoming Barriers to Organizational Change , 1993 .

[40]  Umit Bititci,et al.  Quantitative models for performance measurement system , 2000 .

[41]  D. Tripathi,et al.  Relationship between TQM and TPM implementation factors and business performance of manufacturing industry in Indian context , 2005 .

[42]  Udo Konradt,et al.  User-Centered Software Development: Methodology and Usability Issues , 2003 .

[43]  M. T. Hides,et al.  Factors affecting successful implementation of total productive maintenance , 1999 .

[44]  Adolfo Crespo Márquez,et al.  Learning about failure root causes through maintenance records analysis , 2004 .

[45]  John Gennard,et al.  Power and Influence in the Boardroom , 2001 .

[46]  Umit Bititci,et al.  Dynamics of performance measurement systems , 2000 .

[47]  J. Moubray Reliability-centred maintenance , 1995 .