Trust-driven both-matched algorithm for grid task multi-objective scheduling
暂无分享,去创建一个
[1] Muthucumaru Maheswaran,et al. Integrating trust into grid resource management systems , 2002, Proceedings International Conference on Parallel Processing.
[2] Huang Bao-bian. Trust mechanism-based dynamic task scheduling in grid computing , 2006 .
[3] Howard Jay Siegel,et al. Representing Task and Machine Heterogeneities for Heterogeneous Computing Systems , 2000 .
[4] Zhang Wei. A Trust-QoS Enhanced Grid Service Scheduling , 2006 .
[5] Atakan Dogan,et al. Scheduling of a meta-task with QoS requirements in heterogeneous computing systems , 2006, J. Parallel Distributed Comput..
[6] Liu Duan-yang. TD_Max-min: New Trust-driven Job Schedule Algorithm for Grid Computing , 2007 .
[7] Xu Hao,et al. A Reputation-based Trust Model for Grid Computing , 2006 .
[8] Jiang Chang-jun,et al. A Both Matched Dynamic Scheduling Algorithm , 2005 .
[9] Atakan Dogan,et al. Matching and Scheduling Algorithms for Minimizing Execution Time and Failure Probability of Applications in Heterogeneous Computing , 2002, IEEE Trans. Parallel Distributed Syst..
[10] Wu Zhao-hui. Research of Trust Quantification Based on Grid System , 2005 .