Improving Production Logistics Through Materials Flow Control and Lot Splitting
暂无分享,去创建一个
Luís M. S. Dias | Nuno O. Fernandes | Catarina Gomes | Andreia Ribeiro | João Freitas | Guilherme A. B. Pereira | António Vieira | Silvio Carmo-Silva
[1] Yuehwern Yih,et al. Generic kanban systems for dynamic environments , 1994 .
[2] S. T. Enns. An integrated system for controlling shop loading and work flow , 1995 .
[3] Peter Nyhuis,et al. Fundamentals of Production Logistics: Theory, Tools and Applications , 2008 .
[4] F. Robert Jacobs,et al. REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .
[5] Jan Riezebos,et al. Workload balancing capability of pull systems in MTO production , 2010 .
[6] Uday S. Karmarkar,et al. Lot Sizes, Lead Times and In-Process Inventories , 1987 .
[7] Anabela Carvalho Alves,et al. A Framework for Understanding Cellular Manufacturing Systems , 2004 .
[8] Gary L. Ragatz,et al. The impact of lot splitting on due date performance , 1994 .
[9] Subhash C. Sarin,et al. A review of lot streaming , 2013 .
[10] Huan Neng Chiu,et al. A comprehensive review of lot streaming , 2005 .
[11] G. Gaalman,et al. The influence of shop characteristics on workload control , 2000 .
[12] Gerard Gaalman,et al. Exploring applicability of the workload control concept , 2004 .
[13] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[14] J. Little. A Proof for the Queuing Formula: L = λW , 1961 .
[15] Wolfgang Bechte. Load-oriented manufacturing control just-in-time production for job shops , 1994 .