Impact of Parameter Changes in a Service Provider Closed-Loop Supply Chain with Customer-Owned-Stock
暂无分享,去创建一个
[1] Tongdan Jin,et al. Managing performance based logistics by balancing reliability and spare parts stocking , 2011, 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering.
[2] D. Cattrysse,et al. Cost allocation in spare parts inventory pooling , 2007 .
[3] A. A. Kranenburg,et al. A new partial pooling structure for spare parts networks , 2009, Eur. J. Oper. Res..
[4] Sven Axsäter,et al. Modelling Emergency Lateral Transshipments in Inventory Systems , 1990 .
[5] Erhan Kutanoglu,et al. An inventory sharing and allocation method for a multi-location service parts logistics network with time-based service levels , 2009, Eur. J. Oper. Res..
[6] Adel A. Ghobbar,et al. Evaluation of forecasting methods for intermittent parts demand in the field of aviation: a predictive model , 2003, Comput. Oper. Res..
[7] Ruud H. Teunter,et al. Inventory models with lateral transshipments: A review , 2011, Eur. J. Oper. Res..
[8] V. Daniel R. Guide,et al. Repairable inventory theory: Models and applications , 1997 .
[9] William W. Sharkey,et al. Cost allocation , 1996 .
[10] W. J. Kennedy,et al. An overview of recent literature on spare parts inventories , 2002 .
[11] Zuo Hongfu,et al. Research on optimization model of civil aircraft spare parts inventory allocation , 2008, 2008 Chinese Control and Decision Conference.
[12] S. Rahman. Reliability Engineering and System Safety , 2011 .
[13] Kamran Moinzadeh,et al. A repairable item inventory system with diagnostic and repair service , 1989 .
[14] Ing.Svetislav Kostić,et al. Optimization of spare parts in a multilevel maintenance system , 1990 .
[15] Jani Kilpi,et al. Pooling of spare components between airlines , 2004 .
[16] Jezdimir Knezevic,et al. Availability based spare optimization using renewal process , 1998 .
[17] Dirk Cattrysse,et al. Stocking decisions for repairable spare parts pooling in a multi-hub system , 2005 .
[18] G. Konstantis,et al. A three echelon spare parts provisioning model , 1986 .
[19] Kirsten Tracht,et al. Effects of Lateral Transshipments in Multi-Echelon Closed-Loop Supply Chains , 2011 .