Cost analysis of a machine repair problem with standby, working vacation and server breakdown
暂无分享,去创建一个
[1] Kuo-Hsiung Wang,et al. Profit analysis of the M/M/R machine repair problem with balking, reneging, and standby switching failures , 2007, Comput. Oper. Res..
[2] U. C. Gupta,et al. On the GI/M/1/N queue with multiple working vacations—analytic analysis and computation , 2007 .
[3] Pieter Wartenhorst,et al. N parallel queueing systems with server breakdown and repair , 1995 .
[4] Naishuo Tian,et al. Stochastic decompositions in the M/M/1 queue with working vacations , 2007, Oper. Res. Lett..
[5] Yutaka Baba,et al. Analysis of a GI/M/1 queue with multiple working vacations , 2005, Oper. Res. Lett..
[6] Anamika Jain,et al. Working vacations queueing model with multiple types of server breakdowns , 2010 .
[7] Richa Sharma,et al. Maximum Entropy Approach for discrete-time unreliable server GeoX/Geo/1 queue with working vacation , 2012, Int. J. Math. Oper. Res..
[8] Genqi Xu,et al. The well-posedness of an M/G/1 queue with second optional service and server breakdown , 2009, Comput. Math. Appl..
[9] Lani Haque,et al. A survey of the machine interference problem , 2007, Eur. J. Oper. Res..
[10] Jau-Chuan Ke,et al. Modified T vacation policy for an M/G/1 queueing system with an unreliable server and startup , 2005, Math. Comput. Model..
[11] Chia-Huang Wu,et al. Multi-server machine repair model with standbys and synchronous multiple vacation , 2012, Comput. Ind. Eng..
[12] Yi-Chih Hsieh,et al. Repairable single server systems with multiple breakdown modes , 1995 .
[13] Gautam Choudhury,et al. An M/G/1 retrial queueing system with two phases of service subject to the server breakdown and repair , 2008, Perform. Evaluation.
[14] Naishuo Tian,et al. Steady-state analysis of a discrete-time batch arrival queue with working vacations , 2010, Perform. Evaluation.
[15] Li Yuan,et al. Reliability analysis of a warm standby repairable system with priority in use , 2011 .
[16] Jau-Chuan Ke,et al. Computational algorithm and parameter optimization for a multi-server system with unreliable servers and impatient customers , 2010, J. Comput. Appl. Math..
[17] Zaiming Liu,et al. An M/G/1 queue with single working vacation and vacation interruption under Bernoulli schedule , 2013 .
[18] Wen Lea Pearn,et al. Optimal Management Policy for Heterogeneous Arrival Queueing Systems with Server Breakdowns and Vacations , 2004 .
[19] Pu Patrick Wang,et al. A vacation queueing model with service breakdowns , 2000 .
[20] Gennadi Falin. An M/G/1 retrial queue with an unreliable server and general repair times , 2010, Perform. Evaluation.
[21] Wen Lea Pearn,et al. The performance measures and randomized optimization for an unreliable server M[x]/G/1 vacation system , 2011, Appl. Math. Comput..
[22] Dong-Yuh Yang,et al. Optimal management of the machine repair problem with working vacation: Newton's method , 2009, J. Comput. Appl. Math..
[23] Naishuo Tian,et al. Performance analysis of GI/M/1 queue with working vacations and vacation interruption , 2008 .
[24] Gautam Choudhury,et al. A BATCH ARRIVAL RETRIAL QUEUE WITH GENERAL RETRIAL TIMES UNDER BERNOULLI VACATION SCHEDULE FOR UNRELIABLE SERVER AND DELAYING REPAIR , 2012 .
[25] Richa Sharma,et al. Optimal control of (N, F) policy for unreliable server queue with multi-optional phase repair and start-up , 2012, Int. J. Math. Oper. Res..
[26] Hideaki Takagi,et al. M/G/1 queue with multiple working vacations , 2006, Perform. Evaluation.
[27] Jau-Chuan Ke,et al. The optimal control of an M/G/1 queueing system with server vacations, startup and breakdowns , 2003 .
[28] Kailash C. Madan,et al. On an M [X] / G /1 queuing system with random breakdowns, server vacations, delay times and a standby server , 2012 .
[29] Min Xie,et al. Availability and reliability of k-out-of-(M+N): G warm standby systems , 2006, Reliab. Eng. Syst. Saf..
[30] Naishuo Tian,et al. The Discrete-Time GI/Geo/1 Queue with Multiple Vacations , 2002, Queueing Syst. Theory Appl..
[31] M. Jain,et al. Synchronous working vacation policy for finite-buffer multiserver queueing system , 2011, Appl. Math. Comput..
[32] Mian Zhang,et al. Performance analysis of M/G/1 queue with working vacations and vacation interruption , 2010, J. Comput. Appl. Math..