A performance evaluation of a Stewart platform based Hume concrete pipe manipulator
暂无分享,去创建一个
Recently, a tele-operated Stewart platform based Hume concrete pipe manipulator (HCPM) was developed to improve the safety, quality, and productivity of conventional Hume concrete pipe laying work. The primary objectives of this study are to develop a model for performance evaluation of the HCPM, and to then utilize the model to analyze the HCPM's overall work performance. Conclusions and recommendations are made concerning the value of implementing and commercializing the HCPM. Finally, it is anticipated that the performance evaluation model and the methodology presented in this study could be effectively used in analyzing the performance of other automated construction machines.
[1] Leonhard E. Bernold,et al. Comparative Performance Evaluation of Tele-Operated Pipe Laying , 2003 .
[2] Junbok Lee,et al. A Development of Stewart Platform Based Pipe Manipulator , 2004 .
[3] Leonhard E. Bernold,et al. Saving Lives and Money with Robotic Trenching and Pipe Installation , 1999 .
[4] Carl T. Haas,et al. Rapid Geometric Modeling for Unstructured Construction Workspaces , 2003 .
[5] Leonhard E. Bernold,et al. CAD-Integrated Excavation and Pipe Laying , 1997 .