A Novel IPR Calculation Technique to Reduce Oscillations in Time-Lagged Network-Reservoir Coupled Modeling Using Analytical Scaling and Fast Marching Method
暂无分享,去创建一个
[1] B. Rubin,et al. A Semi-Implicit Approach for Integrated Reservoir and Surface-Network Simulation , 2014 .
[2] M. J. King,et al. Radius of Investigation and its Generalization to Unconventional Reservoirs , 2011 .
[3] J A Sethian,et al. A fast marching level set method for monotonically advancing fronts. , 1996, Proceedings of the National Academy of Sciences of the United States of America.
[4] K. Karasaki,et al. Estimation of reservoir properties using transient pressure data: An asymptotic approach , 2000 .
[5] Akhil Datta-Gupta,et al. Fast-Marching Methods for Complex Grids and Anisotropic Permeabilities: Application to Unconventional Reservoirs , 2013, ANSS 2013.
[6] Baris Guyaguler,et al. Integrated Optimization of Field Development, Planning, and Operation , 2006 .
[7] D. W. Peaceman. Interpretation of Well-Block Pressures in Numerical Reservoir Simulation(includes associated paper 6988 ) , 1978 .
[8] Baris Guyaguler,et al. Near-Well-Subdomain Simulations for Accurate Inflow-Performance-Relationship Calculation To Improve Stability of Reservoir/Network Coupling , 2011 .
[9] Kassem Ghorayeb,et al. A General Purpose Controller for Coupling Multiple Reservoir Simulations and Surface Facility Networks , 2003 .
[10] J. W. Watts,et al. A Generalized Wellbore and Surface Facility Model, Fully Coupled to a Reservoir Simulator , 2004 .
[11] Pierre Samier,et al. A Fully Coupled Network Model, Practical Issues and Comprehensive Comparison with Other Integrated Models on Field Cases , 2015, ANSS 2015.