Maintenance value drivers, killers and their indicators
暂无分享,去创建一个
Uday Kumar | Aditya Parida | Diego Galar | Christer Stenström | A. Parida | U. Kumar | D. Galar | C. Stenström
[1] Aditya Parida,et al. Maintenance Productivity and Performance Measurement , 2009 .
[2] Arne Nissen. Classification and cost analysis of switches and crossings for the Swedish railway: a case study , 2009 .
[3] Uday Kumar,et al. Benchmarking of the Maintenance Process at Banverket (The Swedish National Rail Administration) , 2008 .
[4] Uday Kumar,et al. Maintenance performance measurement (MPM): issues and challenges , 2006 .
[5] R. Dorf,et al. The Balanced Scorecard: Translating Strategy Into Action , 1997, Proceedings of the IEEE.
[6] Aditya Parida,et al. Development of a multi-criteria hierarchical framework for maintenance performance measurement: concepts, issues and challenges , 2006 .
[7] R. Kaplan,et al. The balanced scorecard--measures that drive performance. , 2015, Harvard business review.
[8] Uday Kumar,et al. Assessment and improvement of railway track safety , 2009 .
[9] Aditya Parida,et al. Development of a multi‐criteria hierarchical framework for maintenance performance measurement (MPM) , 2007 .
[10] Madhav V. Rajan,et al. Cost Accounting: A Managerial Emphasis , 1972 .
[11] Uday Kumar,et al. Product support strategy: conventional versus functional products , 2005 .
[12] Birre Nyström. Aspects of improving punctuality : from data to decision in railway maintenance , 2008 .
[13] Albert H. C. Tsang,et al. A strategic approach to managing maintenance performance , 1998 .
[14] Albert H. C. Tsang. Maintenance performance management in capital intensive organizations , 2000 .
[15] R. Kaplan,et al. The Balanced Scorecard: Translating Strategy into Action , 1996 .