Dynamic performance of hierarchical planning systems : modeling and evaluation with dynamic planned lead times
暂无分享,去创建一个
[1] Hubert Missbauer,et al. Aggregate order release planning for time-varying demand , 2002 .
[2] Germán Riaño,et al. Transient behavior of stochastic networks :application to production planning with load-dependent lead times , 2002 .
[3] Ton G. de Kok,et al. Optimal control of a divergent multi-echelon inventory system , 1998, Eur. J. Oper. Res..
[4] Jan Fransoo,et al. Planning Supply Chain Operations: Definition and Comparison of Planning Concepts , 2003, Supply Chain Management.
[5] Kenneth N. McKay,et al. A review of hierarchical production planning and its applicability for modern manufacturing , 1995 .
[6] Chu‐Hua Kuei,et al. Designing and Managing the Supply Chain Concepts, Strategies, and Case Studies , 2000 .
[7] John L. Burbidge,et al. Production planning and control: A personal philosophy , 1985 .
[8] Marcel F. Neuts,et al. Matrix-geometric solutions in stochastic models - an algorithmic approach , 1982 .
[9] Uday S. Karmarkar,et al. Lot Sizes, Lead Times and In-Process Inventories , 1987 .
[10] Jm Judith Spitter,et al. Timing production in LP models in a rolling schedule , 2005 .
[11] Willem H.M. Zijm,et al. Capacity planning and lead time management , 1996 .
[12] Averill M. Law,et al. Simulation modelling and analysis , 1991 .
[13] David L. Woodruff,et al. Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .
[14] de Ag Ton Kok,et al. A safety stock adjustment procedure to enable target service levels in simulation of generic inventory systems , 2002 .
[15] Jwm Will Bertrand,et al. Production Control: A Structural and Design Oriented Approach , 1990 .
[16] Nico Vandaele,et al. A general approximation for the single product lot sizing model with queueing delays , 1996 .
[17] J. Bertrand. The Effect of Workload Dependent Due-Dates on Job Shop Performance , 1983 .
[18] U. Karmarkar,et al. Lotsizing in Multi-Item Multi- Machine Job Shops , 1985 .
[19] R. Anthony,et al. Planning and Control Systems: A Framework for Analysis , 1965 .
[20] Wallace J. Hopp,et al. Quoting manufacturing due dates subject to a service level constraint , 2000 .
[21] Jwm Will Bertrand,et al. Production control and information systems for component-manufacturing shops , 1981 .
[22] W. H. M. Zijm,et al. Towards intelligent manufacturing planning and control systems , 2000, OR Spectr..
[23] Ivo J. B. F. Adan,et al. An explicit analysis of the lead time syndrome: stability condition and performance evaluation , 2009 .
[24] David L. Woodruff,et al. Production planning with load dependent lead times , 2005, 4OR.
[25] 佐藤 紘光. 企業予算編成の行動過程とその数理的解析−Generalized Goal Decomposition Modelの適用− , 1974 .
[26] EG Ebbe Negenman. Material coordination under capacity constraints , 2000 .
[27] Uday S. Karmarkar,et al. Chapter 6 Manufacturing lead times, order release and capacity loading , 1993, Logistics of Production and Inventory.
[28] S. T. Enns,et al. A dynamic forecasting model for job shop flowtime prediction and tardiness control , 1995 .
[29] Hubert Missbauer,et al. Models of the transient behaviour of production units to optimize the aggregate material flow , 2009 .
[30] Stewart Robinson,et al. Simulation: A Statistical Perspective , 1993 .
[31] Jwm Will Bertrand,et al. Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions , 2001 .
[32] Sven Axsäter,et al. Disaggregation under Uncertainty in Hierarchical Production Planning , 1988 .
[33] J. Muckstadt,et al. Protective stocks in multi-stage production systems , 1984 .
[34] S. T. Enns. MRP performance effects due to lot size and planned lead time settings , 2001 .
[35] William L. Maxwell,et al. Theory of scheduling , 1967 .
[36] G. W. Plossl,et al. Throughput time control , 1988 .
[37] Herbert E. Scarf,et al. Optimal Policies for a Multi-Echelon Inventory Problem , 1960, Manag. Sci..
[38] John J. Kanet,et al. Toward a better understanding of lead times in MRP systems , 1986 .
[39] John O. McClain,et al. Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction , 1983 .
[40] D. Armbruster,et al. Continuous models for production flows , 2004, Proceedings of the 2004 American Control Conference.
[41] Guy Latouche,et al. A general class of Markov processes with explicit matrix-geometric solutions , 1986 .
[42] Chen-Hua Chung,et al. Planning horizons for master production scheduling , 1984 .
[43] John A. Buzacott,et al. Service Level in Multistage MRP and Base Stock Controlled Production Systems , 1992 .
[44] G. Zäpfel. Production planning in the case of uncertain individual demand Extension for an MRP II concept , 1996 .
[45] de Ag Ton Kok,et al. The effect of updating lead times on the performance of hierarchical planning systems , 2006 .
[46] Robert C. Leachman,et al. A general framework for modeling production , 1989 .
[47] Christoph A. Schneeweiss,et al. Planning and scheduling the repair shops of the Deutsche Lufthansa AG: A hierarchical approach , 1992 .
[48] Candace Aria Yano,et al. Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs , 1987 .
[49] Stephen C. Graves,et al. A Tactical Planning Model for a Job Shop , 1986, Oper. Res..
[50] Gerard Gaalman,et al. The performance of workload control concepts in job shops: improving the release method , 1996 .
[51] V. Sridharan,et al. A hierarchical approach for capacity coordination in multiple products single-machine production systems with stationary stochastic demands , 1995 .
[52] Chen-Hua Chung,et al. Notes and Communications REPLANNING FREQUENCIES FOR MASTER PRODUCTION SCHEDULES , 1986 .
[53] Herbert Meyr,et al. Architecture of Selected APS , 2008 .
[54] G. Zäpfel,et al. New concepts for production planning and control , 1993 .
[55] A. Molinder,et al. Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system , 1997 .
[56] Jan Karel Lenstra,et al. Linear programming models with planned lead times for supply chain operations planning , 2005, Eur. J. Oper. Res..
[57] Chen-Hua Chung,et al. Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure , 1988 .
[58] Feng-Chang R. Chang. A study of factors affecting due-date predictability in a simulated dynamic job shop , 1994 .
[59] J.S.H. van Leeuwaarden,et al. Quasi-Birth-and-Death Processes with an Explicit Rate Matrix , 2006 .
[60] Jakob Asmundsson,et al. Tractable Nonlinear Capacity Models for Production Planning Part I : Modelling and Formulations , 2002 .
[61] Brian G. Kingsman,et al. A structural methodology for managing manufacturing lead times in make-to-order companies , 1989 .
[62] J. C. Fransoo,et al. Work-in-process clearing in supply chain operations planning , 2008 .
[63] Christoph A. Schneeweiss,et al. Hierarchies in Distributed Decision Making , 1999 .
[64] Jwm Will Bertrand,et al. The structuring of production control systems , 1986 .
[65] S. Graves. Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems , 1982 .
[66] R. Uzsoy,et al. Tractable nonlinear production planning models for semiconductor wafer fabrication facilities , 2006, IEEE Transactions on Semiconductor Manufacturing.
[67] Jeremy F. Shapiro,et al. Mathematical programming models and methods for production planning and scheduling , 1988 .
[68] Arnoldo C. Hax,et al. Hierarchical integration of production planning and scheduling , 1973 .
[69] Wolfgang Bechte. Theory and practice of load-oriented manufacturing control , 1988 .
[70] Ronald H. Coase,et al. The Pig-Cycle in Great Britain: An Explanation , 1937 .
[72] Kevin J. Dooley,et al. Dynamic rules for due-date assignment , 1991 .
[73] J. Will M. Bertrand,et al. The performance of workload rules for order acceptance in batch chemical manufacturing , 2000, J. Intell. Manuf..
[74] Gabriel R. Bitran,et al. ON THE DESIGN OF HIERARCHICAL PRODUCTION PLANNING SYSTEMS , 1977 .
[75] M. Livio. The Golden Ratio: The Story of Phi, the World's Most Astonishing Number , 2002 .
[76] Ilias P. Tatsiopoulos,et al. Lead time management , 1983 .
[77] George B. Dantzig,et al. Decomposition Principle for Linear Programs , 1960 .
[78] Wallace J. Hopp,et al. Factory physics : foundations of manufacturing management , 1996 .
[79] Sven Axsäter,et al. Aggregation of Product Data for Hierarchical Production Planning , 1981, Oper. Res..
[80] S. T. Enns,et al. Work load responsive adjustment of planned lead times , 2004 .
[81] Peter Nyhuis,et al. The workload control concept: theory and practical extensions of Load Oriented Order Release , 2002 .