An N-Product, Multi-Machine, Lotsize Scheduling Model
暂无分享,去创建一个
[1] Salah E. Elmaghraby,et al. The machine sequencing problem – review and extensions , 1968 .
[2] J. H. Krone. A Note on Economic Lot Sizes for Multi-Purpose Equipment , 1964 .
[3] Salah E. Elmaghraby,et al. The Scheduling of Lots on a Single Facility , 1970 .
[4] J. Thompson,et al. A GENERAL MODEL FOR EXPONENTIALLY COMPOUNDING AND DISCOUNTING FUTURE CASH FLOWS , 1965 .
[5] J. F. Pierce. Application of Combinatorial Programming to a Class of All-Zero-One Integer Programming Problems , 1968 .
[6] William L. Maxwell,et al. The scheduling of economic lot sizes , 1964 .
[7] Michel Balinski,et al. Integer Programming: Methods, Uses, Computations , 1965 .
[8] W. Zangwill. A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System---A Network Approach , 1969 .
[9] Thom J. Hodgson,et al. Addendum to Stankard and Gupta's Note on Lot Size Scheduling , 1970 .
[10] Alan S. Manne,et al. Programming of Economic Lot Sizes , 1958 .
[11] E. Balas. An Additive Algorithm for Solving Linear Programs with Zero-One Variables , 1965 .
[12] Fred Hanssmann. Operations research in production and inventory control , 1962 .
[13] P. A. Jensen,et al. Scheduling in a Multistage Production System with Set-up and Inventory Costs , 1972 .
[14] Earl E. Bomberger,et al. A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .
[15] A. M. Geoffrion,et al. Integer Programming Algorithms: A Framework and State-of-the-Art Survey , 1972 .
[16] J. G. Madigan,et al. Scheduling a Multi-Product Single Machine System for an Infinite Planning Period , 1968 .
[17] Jack D. Rogers. A Computational Approach to the Economic Lot Scheduling Problem , 1958 .