SETTLEMENT OF BRIDGE APPROACHES (THE BUMP AT THE END OF THE BRIDGE)
暂无分享,去创建一个
R W James | J-L Briaud | S B Hoffman | J. Briaud | T. E.I. | E. P. | Ray W. James | Stacey B. Hoffman
[1] Raymond A Grover. MOVEMENTS OF BRIDGE ABUTMENTS AND SETTLEMENTS OF APPROACH PAVEMENTS IN OHIO , 1978 .
[2] Tommy C. Hopkins,et al. THE BUMP AT THE END OF THE BRIDGE , 1970 .
[3] A J Schwidder. ESTIMATION OF STRESS AND DEFORMATION PARAMETERS AT SALT FORK RIVER BRIDGES ON US 177 (MASTER'S THESIS) , 1994 .
[4] L K Moulton,et al. Tolerable movement criteria for highway bridges , 1981 .
[5] P Martin,et al. BRIDGE APPROACH PAVEMENTS, INTEGRAL BRIDGES, AND CYCLE-CONTROL JOINTS , 1987 .
[6] G Hearn. FAULTED PAVEMENTS AT BRIDGE ABUTMENTS , 1997 .
[7] Robert E. Abendroth,et al. PILE DESIGN AND TESTS FOR INTEGRAL ABUTMENT BRIDGES. FINAL REPORT , 1987 .
[8] J T Price,et al. GEOTEXTILES ELIMINATE APPROACH SLAB SETTLEMENT , 1986 .
[9] T C Hopkins,et al. Long term movements of highway bridge approach embankments and pavements , 1985 .
[10] C F Stewart,et al. HIGHWAY STRUCTURE APPROACHES. FINAL REPORT , 1985 .
[11] Tommy C. Hopkins,et al. SETTLEMENT OF HIGHWAY BRIDGE APPROACHES AND EMBANKMENT FOUNDATIONS , 1969 .