Effectiveness of dry ponds for stormwater total suspended solids removal
暂无分享,去创建一个
Y Shammaa | D Z Zhu | L L Gyürék | C W Labatiuk | Y. Shammaa | L. Gyürek | C. Labatiuk | D. Z. Zhu
[1] Chaney. Environmental monitoring program , 1981 .
[2] G K Young,et al. EVALUATION AND MANAGEMENT OF HIGHWAY RUNOFF WATER QUALITY , 1996 .
[3] Barry J. Adams,et al. Detention time selection for stormwater quality control ponds , 1999 .
[4] T. Schueler,et al. Design of Extended Detention Wet Pond Systems , 1988 .
[5] Peter Stahre,et al. Stormwater detention: For drainage, water quality, and CSO management , 1989 .
[6] David Z. Zhu,et al. Techniques for Controlling Total Suspended Solids in Stormwater Runoff , 2001 .
[7] Vladimir Novotny,et al. Nonpoint pollution and urban stormwater management , 1995 .
[8] Larry A. Roesner,et al. Design of Urban Runoff Quality Controls , 1988 .
[9] J. Maršálek,et al. Stormwater detention & BMPs , 1996 .
[10] W. E. Watt,et al. Retrofitting Stormwater Ponds for Water Quality Control , 1992 .
[11] D. Stanley,et al. Pollutant removal by a stormwater dry detention pond , 1996 .
[12] C. Valeo,et al. Developing a Regional Correlation Function for Rainfall near Hamilton, Ontario , 2001 .
[13] Ben Urbonas. Parameters to Report with BMP Monitoring Data , 1994 .
[14] Bruce C. Anderson,et al. Extending Retention Times in a Stormwater Pond with Retrofitted Baffles , 1997 .
[15] Barry J. Adams,et al. Quality Control Optimization of Extended Detention Dry Ponds. , 1996 .