Multi-agent based joint production and maintenance scheduling considering human resources
暂无分享,去创建一个
[1] Liang Gao,et al. An agent-based approach for integrated process planning and scheduling , 2010, Expert Syst. Appl..
[2] Mozafar Saadat,et al. Agents-based interaction protocols and topologies in manufacturing task allocation , 2010, 2010 5th International Conference on System of Systems Engineering.
[3] Bassam Baki. Planification et ordonnancement probabilistes sous contraintes temporelles , 2006 .
[4] Noureddine Zerhouni,et al. Proactive, dynamic and multi-criteria scheduling of maintenance activities , 2008 .
[5] Khalid Kouiss,et al. Using multi-agent architecture in FMS for dynamic scheduling , 1997, J. Intell. Manuf..
[6] Bernard Grabot,et al. Systèmes multiagents et logique floue pour un ordonnancement cooperative production/maintenance , 2004, J. Decis. Syst..
[7] Noureddine Zerhouni,et al. Joint scheduling of jobs and Preventive Maintenance operations in the flowshop sequencing problem: a resolution with sequential and integrated strategies , 2011, Int. J. Manuf. Res..
[8] G. Goncalves,et al. A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line , 2001 .