Using Residential AC Load Control in Grid Operations : PG & E ’ s Ancillary Service Pilot
暂无分享,去创建一个
Joseph H. Eto | Michael Sullivan | Josh Bode | Bashar Kellow | Sarah Woehleke | Bashar Kellow | Michael Sullivan | Josh Bode | Sarah Woehleke | Joseph H. Eto
[1] Bj Kirby. Spinning Reserve from Pump Load: A Technical Findings Report to the California Department of Water Resources , 2005 .
[2] William Gifford,et al. Customer Impact Evaluation for the 2009 Southern California Edison Participating Load Pilot , 2010 .
[3] Joseph H. Eto,et al. Demand Response Spinning Reserve Demonstration , 2007 .
[4] C. Marnay,et al. An R&D agenda to enhance electricity system reliability by increasing customer participation in emerging competitive markets , 2001, 2001 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.01CH37194).
[5] J. D. Kueck,et al. Load As A Reliability Resource in the Restructured Electricity Market , 2002 .
[6] Paul D. Allison,et al. Survival analysis using sas®: a practical guide , 1995 .
[7] Joseph H. Eto. Demand Response Spinning Reserve Demonstration -- Phase 2 Findings from the Summer of 2008 , 2010 .
[8] W. Marsden. I and J , 2012 .