Analysis of joint maintenance and production policies under a subcontracting constraint

In this paper, we deal with the problem of joint maintenance and production management under a subcontracting constraint. We will study a system with a machine M which undergoes corrective maintenance actions together with preventive maintenance actions, both of which have random durations. A stock S with a capacity h is developed at a rate α = U max – d, where U max = production rate, d = constant demand, and U max > d. In addition, machine M is allocated to carry out subcontracting tasks (ST) at a frequency A 1, for an effective duration A 2, during which time it cannot be used to fulfil our system's demand d. We initially study the system analytically when the machine M is forced to carry out a single subcontracting task during each cycle T. We thereafter present a generalization of the subcontracting constraint which entails assigning the machine M to subcontracting several times during each cycle.

[1]  Ali Gharbi,et al.  Production and preventive maintenance rates control for a manufacturing system: An experimental design approach , 2000 .

[2]  El Houssaine Aghezzaf,et al.  An integrated production and preventive maintenance planning model , 2007, Eur. J. Oper. Res..

[3]  Ali Gharbi,et al.  Stohastic optimal production control problem with corrective maintenance , 2004, Comput. Ind. Eng..

[4]  Gianluca Spina,et al.  A comparison of practice‐performance models between small manufacturers and subcontractors , 2002 .

[5]  Ali Gharbi,et al.  A simulation optimization approach in production planning of failure prone manufacturing systems , 2001, J. Intell. Manuf..

[6]  Russell D. Meller,et al.  The impact of preventive maintenance on system cost and buffer size , 1996 .

[7]  Sofia Panagiotidou,et al.  Optimal preventive maintenance for equipment with two quality states and general failure time distributions , 2007, Eur. J. Oper. Res..

[8]  Ki Ling Cheung,et al.  Joint determination of preventive maintenance and safety stocks in an unreliable production environment , 1997 .

[9]  El-Kébir Boukas,et al.  Manufacturing flow control and preventing maintenance: a stochastic control approach , 1988 .

[10]  Poul Houman Andersen,et al.  Inter-partner learning in global supply chains: lessons from NOVO Nordisk , 2000 .

[11]  Ruhul A. Sarker,et al.  Optimization of maintenance and spare provisioning policy using simulation , 2000 .

[12]  Mandyam M. Srinivasan,et al.  Production-Inventory Systems with Preventive Maintenance , 1996 .

[13]  Jean Nollet,et al.  Issues on partnering: evidences from subcontracting in aeronautics , 2001 .

[14]  Nidhal Rezg,et al.  Preventive maintenance of manufacturing systems under environmental constraints , 2007 .

[15]  J. Will M. Bertrand,et al.  A study of simple rules for subcontracting in make-to-order manufacturing , 2001, Eur. J. Oper. Res..

[16]  Poul Houman Andersen,et al.  Organizing international technological collaboration in subcontractor relationships: an investigation of the knowledge-stickiness problem , 1999 .

[17]  Izak Duenyas,et al.  Integrated maintenance and production control of a deteriorating production system , 2002 .

[18]  Nidhal Rezg,et al.  Joint optimization of preventive maintenance and inventory control in a production line using simulation , 2004 .

[19]  Benjamin Gomes-Casseres Group versus group: How alliance networks compete , 1994 .

[20]  F. A. van der Duyn Schouten,et al.  Maintenance optimization of a production system with buffer capacity , 1995 .