Sequencing heuristics for dependent setups in a continuous process industry
暂无分享,去创建一个
[1] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[2] A. G. Lockett,et al. Technical Note - A Scheduling Problem Involving Sequence Dependent Changeover Times , 1972, Oper. Res..
[3] Clyde L. Monma,et al. On the Complexity of Scheduling with Batch Setup Times , 1989, Oper. Res..
[4] Ergin Uskup,et al. A Branch-and-Bound Algorithm for Two-Stage Production-Sequencing Problems , 1975, Oper. Res..
[5] Shokri Z. Selim,et al. A sequencing problem in the weaving industry , 1993 .
[6] John L. Bruno,et al. Complexity of Task Sequencing with Deadlines, Set-Up Times and Changeover Costs , 1978, SIAM J. Comput..
[7] C. A. Komar,et al. The Effectiveness of Three Heuristic Rules for Job Sequencing in a Single Production Facility , 1973 .
[8] C. R. Glassey,et al. Minimum Change-Over Scheduling of Several Products on One Machine , 1968, Oper. Res..
[9] G. K. Leong,et al. A sequencing heuristic for dependent setups in a batch process industry , 1990 .
[10] Averill M. Law,et al. The art and theory of dynamic programming , 1977 .
[11] J. William Gavett,et al. Three Heuristic Rules for Sequencing Jobs to a Single Production Facility , 1965 .
[12] W. J. Selen,et al. Operational production planning in a chemical manufacturing environment , 1990 .
[13] Richard C. Wilson,et al. Sequence dependent set-up times and job sequencing , 1977 .