Streamlining or sidestepping? Political pressure to revise environmental licensing and EIA in Brazil

Abstract In the Anthropocene, governments are increasingly being forced to take action to minimize or reverse human impacts on the environment. One of the most widespread legal instruments to prevent negative impacts on the environment is Environmental Impact Assessment (EIA). Almost all countries have an EIA system in place aimed at mitigating the diverse impacts causing by development projects. A common drawback of such systems is that they are often ineffective and time-consuming, and are therefore frequently viewed by politicians as “in the way” of development. This is the case in Brazil, where EIA has had a very limited influence on decision-making and where environment reforms (e.g. the new Forest Code) have often been strongly influenced by powerful lobbies (e.g. agribusiness groups, industry actors, etc.) and conservative legislators. Continuing this trend, the most recent political developments have seen the proposal of a series of amendments aimed at “streamlining” the Brazilian EIA system. In this viewpoint, we provide an in depth analysis of the proposed changes, highlighting the serious consequences that would accompany the weakening of environmental licensing and EIA legislation in Brazil.

[1]  P. Fearnside Brazil’s São Luiz do Tapajós Dam: The Art of Cosmetic Environmental Impact Assessments , 2015 .

[2]  P. Jacobi,et al.  Licenciamento Ambiental e ampliação da cidadania: o Caso da Hidrelétrica de Tijuco Alto , 2011 .

[3]  Vanessa de Freitas Cunha Lins,et al.  Aspectos do coprocessamento de resíduos em fornos de clínquer , 2011 .

[4]  Amarilis Lucia Casteli Figueiredo Gallardo,et al.  AVALIAÇÃO AMBIENTAL ESTRATÉGICA PARA O PLANEJAMENTO DA EXPANSÃO DA CANA-DE-AÇÚCAR: UMA PROPOSTA DE ROTEIRO , 2016 .

[5]  J. Tollefson Political upheaval threatens Brazil’s environmental protections , 2016, Nature.

[6]  J. Arts,et al.  Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure , 2014 .

[7]  Bram F. Noble,et al.  Advancing strategic environmental assessment in the offshore oil and gas sector: Lessons from Norway, Canada, and the United Kingdom , 2012 .

[8]  A. Magrini,et al.  The Brazilian Audit Tribunal's role in improving the federal environmental licensing process , 2010 .

[9]  Luis Enrique Sánchez,et al.  A pressure–state–response approach to cumulative impact assessment , 2016 .

[10]  Carlos Eduardo Frickmann,et al.  HOW GREEN IS MY BUDGET? PUBLIC ENVIRONMENTAL EXPENDITURES IN BRAZIL , 2012 .

[11]  L. Canter,et al.  Adaptive management with integrated decision making: an emerging tool for cumulative effects management , 2010 .

[12]  Luis Enrique Sánchez,et al.  Development of Environmental Impact Assessment in Brazil , 2013 .

[13]  Gelze Serrat de Souza Campos Rodrigues,et al.  A análise interdisciplinar de processos de licenciamento ambiental no estado de Minas Gerais: conflitos entre velhos e novos paradigmas , 2010 .

[14]  Marcelo Montaño,et al.  Strategic Environmental Assessment to Improve Infrastructure Impact Assessments in Brazil , 2013 .

[15]  Luis Enrique Sánchez,et al.  Reforming EIA systems: A critical review of proposals in Brazil , 2017 .

[16]  Nelson Novaes Pedroso Júnior,et al.  Judicialização de grandes empreendimentos no Brasil: uma visão sobre os impactos da instalação de usinas hidrelétricas em populações locais na amazônia , 2015 .

[17]  Erle C. Ellis,et al.  The Anthropocene is functionally and stratigraphically distinct from the Holocene , 2016, Science.

[18]  N. T. Yap,et al.  Public Participation in Environmental Assessment: Case Studies on EA Legislation and Practice , 2005 .

[19]  E. Bernard,et al.  Downgrading, Downsizing, Degazettement, and Reclassification of Protected Areas in Brazil , 2014, Conservation biology : the journal of the Society for Conservation Biology.

[20]  John Glasson,et al.  Introduction to Environmental Impact Assessment , 1999 .

[21]  Angela Pellin,et al.  Avaliação ambiental estratégica no Brasil: considerações a respeito do papel das agências multilaterais de desenvolvimento , 2011 .

[22]  L. Sánchez,et al.  Advancing scoping practice in environmental impact assessment: an examination of the Brazilian federal system , 2017 .

[23]  P. Fearnside Brazilian politics threaten environmental policies , 2016, Science.

[24]  Carla Grigoletto Duarte,et al.  Analisando audiências públicas no licenciamento ambiental: quem são e o que dizem os participantes sobre projetos de usinas de cana-de-açúcar , 2016 .

[25]  P. Fearnside Viewpoint – Brazil’s Madeira River Dams: A Setback for Environmental Policy in Amazonian Development , 2014 .

[26]  P. Fearnside Brazil’s Belo Monte Dam: Lessons of an Amazonian resource struggle , 2017 .

[27]  Marcelo Marini Pereira de Souza,et al.  IMPACT ASSESSMENT RESEARCH IN BRAZIL: ACHIEVEMENTS, GAPS AND FUTURE DIRECTIONS , 2015 .

[28]  Philip M. Fearnside,et al.  Amazon dams and waterways: Brazil’s Tapajós Basin plans , 2015, Ambio.

[29]  José Francisco do Prado Filho,et al.  O licenciamento ambiental da mineração no Quadrilátero Ferrífero de Minas Gerais – uma análise da implementação de medidas de controle ambiental formuladas em EIAS/RIMAs. , 2004 .

[30]  Luis Enrique Sánchez,et al.  Tiering strategic environmental assessment and project environmental impact assessment in highway planning in São Paulo, Brazil , 2008 .

[31]  Luis Enrique Sánchez,et al.  Quality And Outcomes: A Critical Review Of Strategic Environmental Assessment In Brazil , 2014 .

[32]  Graziela de Toni Aguilar Análise do tempo de tramitação de processos de licenciamento ambiental: estudo de casos de termelétricas no Estado de São Paulo , 2008 .

[33]  John Glasson,et al.  EIA in Brazil , 2000 .