Towards a short time “feature-based costing” for ship design

Cost is perhaps the most influential factor in the outcome of a product or service within many of today’s industries. Cost assessment during the early stage of ship design is crucial. It influences the go, no-go decision concerning a new development. Cost assessment occurs at various stages of ship design development. Economic evaluation as early as possible, in the design phase, is therefore vital to find the best pricefunction compromise for the ship projects. The authors have developed a feature-based costing model for cost effectiveness measurements intended to be used by ship designers for the real time control of cost process. The outcome is that corrective actions can be taken by management in a rather short time to actually improve or overcome predicted unfavourable performance.

[1]  N. Gol’dman,et al.  Regularization of Ill-Posed Problems by Iteration Methods , 1999 .

[2]  Ronald E. Mickens,et al.  Discretizations of nonlinear differential equations using explicit nonstandard methods , 1999 .

[3]  H. Engl,et al.  Regularization of Inverse Problems , 1996 .

[4]  Chein-Shan Liu Cone of non-linear dynamical system and group preserving schemes , 2001 .

[5]  John M. Barentine A process-based cost estimating tool for ship structural designs , 1996 .

[6]  Fabio Giudice,et al.  Product Design for the Environment: A Life Cycle Approach , 2006 .

[7]  Rajkumar Roy,et al.  Cost engineering: why, what and how? , 2003 .

[8]  Janusz S. Kowalik,et al.  Iterative methods for nonlinear optimization problems , 1972 .

[9]  Philippe Rigo,et al.  Maintenance/repair and production-oriented life cycle cost/earning model for ship structural optimisation during conceptual design stage , 2009 .

[10]  Chein-Shan Liu,et al.  Nonstandard Group-Preserving Schemes for Very Stiff Ordinary Differential Equations , 2005 .

[11]  H. Schneekluth,et al.  Ship Design for Efficiency and Economy , 1987 .

[12]  Philip C Koenig TECHNICAL AND ECONOMIC BREAKDOWN OF VALUE ADDED IN SHIPBUILDING , 2002 .

[13]  K. Kunisch,et al.  Iterative choices of regularization parameters in linear inverse problems , 1998 .

[14]  Satya N. Atluri,et al.  Meshless Local Petrov-Galerkin (MLPG) Mixed Collocation Method For Elasticity Problems , 2006 .

[15]  Means,et al.  Building construction cost data , 1943 .

[16]  Per Christian Hansen,et al.  Analysis of Discrete Ill-Posed Problems by Means of the L-Curve , 1992, SIAM Rev..

[17]  Gerd Holbach,et al.  Cost Management in Shipbuilding: Planning, Analysing and Controlling Product Cost in the Maritime Industry , 2011 .

[18]  William B. Ferguson Shipbuilding cost & production methods , 1944 .

[19]  Philippe Rigo,et al.  An Analytical Cost Assessment Module for the Detailed Design Stage , 2006 .

[20]  Chein-Shan Liu A Modified Trefftz Method for Two-Dimensional Laplace Equation Considering the Domain's Characteristic Length , 2007 .

[21]  Dianne P. O'Leary,et al.  The Use of the L-Curve in the Regularization of Discrete Ill-Posed Problems , 1993, SIAM J. Sci. Comput..

[22]  Chein-Shan Liu,et al.  A Time-Marching Algorithm for Solving Non-Linear Obstacle Problems with the Aid of an NCP-Function , 2008 .

[23]  G Southern WORK CONTENT ESTIMATING FROM A SHIP STEELWORK DATA BASE , 1980 .

[24]  L. Landweber An iteration formula for Fredholm integral equations of the first kind , 1951 .

[25]  Richard Birmingham,et al.  Establishing the economic and environmental life-cycle costs of marine systems : a case study from the recreational craft sector , 2006 .

[26]  Lawrence F. Shampine,et al.  A User’s View of Solving Stiff Ordinary Differential Equations , 1979 .

[27]  Essam Shehab,et al.  An Intelligent Knowledge-Based System for Product Cost Modelling , 2002 .

[28]  George J Bruce,et al.  COST-EFFECTIVE PLANNING AND CONTROL. , 1991 .

[29]  Chein-Shan Liu,et al.  Solving an Inverse Sturm-Liouville Problem by a Lie-Group Method , 2008 .

[30]  Philippe Rigo Least-Cost Structural Optimization Oriented Preliminary Design , 2001 .

[31]  Aristides Miroyannis Estimation of ship construction costs , 2006 .

[32]  Chein-Shan Liu,et al.  A Lie-Group Shooting Method for Simultaneously Estimating the Time-Dependent Damping and Stiffness Coefficients , 2008 .

[33]  Yanfei Wang,et al.  Fast realization algorithms for determining regularization parameters in linear inverse problems , 2001 .

[34]  Satya N. Atluri,et al.  A Novel Time Integration Method for Solving A Large System of Non-Linear Algebraic Equations , 2008 .

[35]  William H. Press,et al.  Numerical recipes in C. The art of scientific computing , 1987 .

[36]  Chein-Shan Liu,et al.  A Fictitious Time Integration Method for Two-Dimensional Quasilinear Elliptic Boundary Value Problems , 2008 .

[37]  Asim Karim,et al.  Construction Scheduling, Cost Optimization and Management , 2001 .

[38]  Jun Zou,et al.  An improved model function method for choosing regularization parameters in linear inverse problems , 2002 .

[39]  G. Stewart Introduction to matrix computations , 1973 .

[40]  Chein-Shan Liu,et al.  An effectively modified direct Trefftz method for 2D potential problems considering the domain's characteristic length. , 2007 .

[41]  Christopher Rush,et al.  Analysis of cost estimating processes used within a concurrent engineering environment throughout a product life cycle , 2000 .

[42]  J Carreyette PRELIMINARY SHIP COST ESTIMATION , 1978 .

[43]  S. Atluri,et al.  A new Meshless Local Petrov-Galerkin (MLPG) approach in computational mechanics , 1998 .

[44]  Chein-Shan Liu,et al.  Identifying time-dependent damping and stiffness functions by a simple and yet accurate method , 2008 .

[45]  S. Atluri,et al.  A meshless numerical method based on the local boundary integral equation (LBIE) to solve linear and non-linear boundary value problems , 1999 .

[46]  A. M. D'Arcangelo,et al.  Ship design and construction , 1969 .

[47]  Philippe Rigo,et al.  Integration of a Bottom-Up Production Cost Model in LBR-5 Optimization Tool , 2007 .

[48]  I. E. Winkle,et al.  TOWARDS MORE EFFECTIVE STRUCTURAL DESIGN THROUGH SYNTHESIS AND OPTIMISATION OF RELATIVE FABRICATION COSTS , 1985 .

[49]  S. Atluri,et al.  The Meshless Local Petrov-Galerkin (MLPG) Method: A Simple \& Less-costly Alternative to the Finite Element and Boundary Element Methods , 2002 .

[50]  Philippe Rigo,et al.  Multi-criteria Scantling Optimisation of Cruise Ships , 2010 .

[51]  Volker Bertram,et al.  Cost Assessment in Ship Production , 2005 .

[52]  H. Brakhage ON ILL-POSED PROBLEMS AND THE METHOD OF CONJUGATE GRADIENTS , 1987 .

[53]  A. Rieder Runge–Kutta integrators yield optimal regularization schemes , 2005 .

[54]  D W Chalmers STRUCTURAL DESIGN FOR MINIMUM COST , 1986 .

[55]  Man-Duen Choi TRICKS OR TREATS WITH THE HILBERT MATRIX , 1983 .

[56]  Philippe Rigo,et al.  How to minimise production costs at the preliminary design stage - scantling optimization , 2003 .

[57]  David M. Dilts,et al.  Automated design-to-cost: integrating costing into the design decision , 1996, Comput. Aided Des..

[58]  Dong Sik Jang,et al.  Approximate Estimation of the Product Life Cycle Cost Using Artificial Neural Networks in Conceptual Design , 2002 .

[59]  Chein-Shan Liu Group preserving scheme for backward heat conduction problems , 2004 .

[60]  John E. Schaufelberger,et al.  Construction Cost Estimating: Process and Practices , 2004 .

[61]  Chein-Shan Liu,et al.  NOVEL METHODS FOR SOLVING SEVERELY ILL-POSED LINEAR EQUATIONS SYSTEM , 2009 .

[62]  Ronald E. Mickens,et al.  Finite-difference models of ordinary differential equations: influence of denominator functions , 1990 .

[63]  Ernie Appleton,et al.  Product Design for Manufacture and Assembly , 2008 .

[64]  Yung-Wei Chen,et al.  Simultaneously Estimating the Time-Dependent Damping and Stiffness Coefficients with the Aid of Vibrational Data , 2008 .

[65]  Panos Zachariadis,et al.  Life cycle cost of maintaining the effectiveness of a ship's structure and environmental impact of ship design parameters: An update , 2009 .

[66]  Philippe Rigo,et al.  Scantling multi-objective optimisation of a LNG carrier , 2010 .

[67]  Chein-Shan Liu A Highly Accurate Solver for the Mixed-Boundary Potential Problem and Singular Problem in Arbitrary Plane Domain , 2007 .

[68]  Kristina Jasaitis Ennis PRODUCT-ORIENTED DESIGN AND CONSTRUCTION COST MODEL , 1998 .

[69]  Philippe Rigo,et al.  Multi-criterion Scantling Optimisation of Passenger Ships , 2010 .

[70]  Heinrich Kerlen Über den Einfluß der Völligkeit auf die Rumpfstahlkosten von Frachtschiffen , 1985 .

[71]  E. Resmerita Regularization of ill-posed problems in Banach spaces: convergence rates , 2005 .