Model for Predicting Architect's Performance in Building Delivery Process

The aim of this study is to construct a model that can be used to predict the architect's overall performance in the Nigeria building delivery process and to provide adequate understanding of the criteria which constitute the model. Architect performance criteria were identified from existing literature within the domain of architect responsibilities and developed into a two‐part questionnaire survey. The survey involves clients of recently completed building projects in Nigeria. The first part of the questionnaire survey consists of 71 clients which were used to construct the model while the second part consists of another 17 clients which were used to validate the model. Based on this data, a predictive discriminant analysis model of two‐group cases (good and poor performance) was developed. The model shows that the predicted architect's overall performance is significantly correlated with the actual validated client ratings (0.783 at 99% confidence interval). The results show that if architects want to achieve good performance, they should give a high level of performance to ‘effective communication of design to contractor and other participants’; ‘effective constructability review’; ‘assistance in quality management strategies and clarity and consistency of specification with drawings’. The study would give architects a fore knowledge on how to ensure good performance in their future enterprise.

[1]  Nigel Cross,et al.  Developments in design methodology , 1984 .

[2]  George F. Sowers,et al.  HUMAN FACTORS IN CIVIL AND GEOTECHNICAL ENGINEERING FAILURES. DISCUSSION AND CLOSURE , 1993 .

[3]  C. J. Huberty,et al.  Applied Discriminant Analysis , 1994 .

[4]  Frank A. Stasiowski,et al.  Total Quality Project Management for the Design Firm: How to Improve Quality, Increase Sales, and Reduce Costs , 1993 .

[5]  C. A. Moser,et al.  Survey Methods in Social Investigation , 1958 .

[6]  Tong Yizhe,et al.  Unbalanced bidding on contracts with variation trends in client-provided quantities , 1992 .

[7]  Stephen Emmitt Architectural Management in Practice: A Competitive Approach , 1999 .

[8]  Richard D. Rush,et al.  The Building systems integration handbook , 1986 .

[9]  James T. O'Connor,et al.  Industrial Project Constructability Improvement , 1986 .

[10]  Alan Griffith,et al.  Constructability in Building and Engineering Projects , 1995 .

[11]  John Piggott,et al.  Global Quality: The New Management Culture , 1993 .

[12]  Olugboyega Adams,et al.  Contractor development in Nigeria: perceptions of contractors and professionals , 1997 .

[13]  Martin Barnes Construction project management , 1988 .

[14]  Olugboyega A. Adams Indigenous contractors' perceptions of the constraints on contractors' performance and development programmes required in Nigeria , 1995 .

[15]  S. T Ng,et al.  Client and consultant perspectives of prequalification criteria , 1999 .

[16]  Nigel Cross,et al.  Observations of teamwork and social processes in design , 1995 .

[17]  David Arditi,et al.  Total quality management in the construction process , 1997 .

[18]  Roy L. Wilson Prevention and Resolution of Construction Claims , 1982 .

[19]  Derek H.T. Walker,et al.  The contribution of the client representative to the creation and maintenance of good project inter‐team relationships , 1998 .

[20]  Simon A. Austin,et al.  Development and verification of a generic framework for conceptual design , 2001 .

[21]  Andi,et al.  Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process , 2003 .

[22]  Martin Skitmore,et al.  Which procurement system? Towards a universal procurement selection technique , 1988 .

[23]  Chi Ming Tam Discriminant analysis model for predicting contractor performance in Hong Kong , 1992 .

[24]  Andrew D.F. Price,et al.  Conceptual phase of construction projects , 1995 .

[25]  Michael Coyle,et al.  Critical Success Factors for Construction Projects , 1992 .