A forward algorithm for capacitated lot sizing problem with lost sales

This paper addresses a single item dynamic lot sizing problem where the inventory capacity is limited and shortages are allowed. Unsatisfied demand cannot be backlogged, which means lost sales. Costs are assumed to be time-varying. Some new properties are obtained in an optimal solution and a dynamic programming algorithm is developed to solve the problem in strongly polynomial with O(T/sup 3/logT) time.

[1]  G. Bitran,et al.  Computational Complexity of the Capacitated Lot Size Problem , 1982 .

[2]  J. K. Lenstra,et al.  Deterministic Production Planning: Algorithms and Complexity , 1980 .

[3]  Chien-Hua M. Lin,et al.  An effective algorithm for the capacitated single item lot size problem , 1994 .

[4]  Suresh Chand,et al.  The single-item lot-sizing problem with immediate lost sales , 2003, Eur. J. Oper. Res..

[5]  Gerald L. Thompson,et al.  A Forward Algorithm for the Capacitated Lot Size Model with Stockouts , 1990, Oper. Res..

[6]  Alok Aggarwal,et al.  Improved Algorithms for Economic Lot Size Problems , 1993, Oper. Res..

[7]  A. Federgruen,et al.  A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0n log n or 0n Time , 1991 .

[8]  Ömer Kirca An efficient algorithm for the capacitated single item dynamic lot size problem , 1990 .

[9]  Chung-Yee Lee,et al.  A new dynamic programming algorithm for the single item capacitated dynamic lot size model , 1994, J. Glob. Optim..

[10]  Joaquin Sicilia,et al.  A new characterization for the dynamic lot size problem with bounded inventory , 2003, Comput. Oper. Res..

[11]  Gerald L. Thompson,et al.  Decision horizons for the capacitated lot size model with inventory bounds and stockouts , 1993, Comput. Oper. Res..

[12]  Stephen F. Love Bounded Production and Inventory Models with Piecewise Concave Costs , 1973 .

[13]  K. R. Baker,et al.  An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints , 1978 .

[14]  M. Florian,et al.  DETERMINISTIC PRODUCTION PLANNING WITH CONCAVE COSTS AND CAPACITY CONSTRAINTS. , 1971 .

[15]  Dong X. Shaw,et al.  An Algorithm for Single-Item Capacitated Economic Lot Sizing with Piecewise Linear Production Costs and General Holding Costs , 1998 .

[16]  Albert P. M. Wagelmans,et al.  Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case , 1992, Oper. Res..

[17]  Harvey M. Wagner,et al.  Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..

[18]  C. Swoveland A Deterministic Multi-Period Production Planning Model with Piecewise Concave Production and Holding-Backorder Costs , 1975 .