A forward algorithm for capacitated lot sizing problem with lost sales
暂无分享,去创建一个
[1] G. Bitran,et al. Computational Complexity of the Capacitated Lot Size Problem , 1982 .
[2] J. K. Lenstra,et al. Deterministic Production Planning: Algorithms and Complexity , 1980 .
[3] Chien-Hua M. Lin,et al. An effective algorithm for the capacitated single item lot size problem , 1994 .
[4] Suresh Chand,et al. The single-item lot-sizing problem with immediate lost sales , 2003, Eur. J. Oper. Res..
[5] Gerald L. Thompson,et al. A Forward Algorithm for the Capacitated Lot Size Model with Stockouts , 1990, Oper. Res..
[6] Alok Aggarwal,et al. Improved Algorithms for Economic Lot Size Problems , 1993, Oper. Res..
[7] A. Federgruen,et al. A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0n log n or 0n Time , 1991 .
[8] Ömer Kirca. An efficient algorithm for the capacitated single item dynamic lot size problem , 1990 .
[9] Chung-Yee Lee,et al. A new dynamic programming algorithm for the single item capacitated dynamic lot size model , 1994, J. Glob. Optim..
[10] Joaquin Sicilia,et al. A new characterization for the dynamic lot size problem with bounded inventory , 2003, Comput. Oper. Res..
[11] Gerald L. Thompson,et al. Decision horizons for the capacitated lot size model with inventory bounds and stockouts , 1993, Comput. Oper. Res..
[12] Stephen F. Love. Bounded Production and Inventory Models with Piecewise Concave Costs , 1973 .
[13] K. R. Baker,et al. An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints , 1978 .
[14] M. Florian,et al. DETERMINISTIC PRODUCTION PLANNING WITH CONCAVE COSTS AND CAPACITY CONSTRAINTS. , 1971 .
[15] Dong X. Shaw,et al. An Algorithm for Single-Item Capacitated Economic Lot Sizing with Piecewise Linear Production Costs and General Holding Costs , 1998 .
[16] Albert P. M. Wagelmans,et al. Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case , 1992, Oper. Res..
[17] Harvey M. Wagner,et al. Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..
[18] C. Swoveland. A Deterministic Multi-Period Production Planning Model with Piecewise Concave Production and Holding-Backorder Costs , 1975 .