An Approach for Solid Modeling and Equipment Fleet Management Towards Low-Carbon Earthwork
暂无分享,去创建一个
[1] Jee-Hee Koo,et al. Earthwork Plan Using the Precise 3D Topographic Data , 2010 .
[2] Jae-Woo Park,et al. Development of the 3D Imaging System and Automatic Registration Algorithm for the Intelligent Excavation System (IES) , 2009 .
[3] Hong-Chul Kim,et al. A Model for Allocating Automated Earthwork Equipment Using Contract Net , 2005 .
[4] Sung-Keun Kim,et al. A Study on 2D-Based Earthwork Planning Methods , 2003 .
[5] Byungsoo Kim. Correlation Analysis on the Duration and CO 2 Emission Following the Earth-work Equipment Combination , 2011 .
[6] Sung-Keun Kim,et al. Development of a Work Information Model and a Work Path Simulator for an Intelligent Excavation , 2012 .
[7] Hyung-Keun Park,et al. A Study of the Combination Method for Earthwork Equipments Using the Environmental Loads and Costs , 2013 .
[8] Y. Yoon,et al. Shear Strength and Deformation Characteristics of Lightweight Soils Mixed with Tire Powder , 2012 .
[9] David G. Carmichael,et al. Emission and Cost Configurations in Earthmoving Operations , 2012 .
[10] Tae-Wook Kang,et al. The Study on the Optimized Earthwork Transfer Path Algorithm Considering the Precluded Area of Massive Cutting and Banking , 2011 .
[11] Sung-Keun Kim. 3D-based Earthwork Planning and CO 2 Emission Estimation for Automated Earthworks , 2013 .