Complexity and the Enterprise: The Illusion of Control

[1]  Stephen F. Smith,et al.  Exploiting Local Flexibility during Execution of Pre-Computed Schedules , 1990 .

[2]  Reha Uzsoy,et al.  Measures of subproblem criticality in decomposition algorithms for shop scheduling , 2003 .

[3]  Eduardo F. Camacho,et al.  Managing risk in semiconductor manufacturing: A stochastic predictive control approach , 2007 .

[4]  Allison Goodman Managing Product Development Risk , 2007 .

[5]  T. Beaumariage,et al.  The nature and origin of chaos in manufacturing systems , 1994, Proceedings of 1994 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop (ASMC).

[6]  Dieter Armbruster,et al.  Controlling a re-entrant manufacturing line via the push-pull point , 2008 .

[7]  Reha Uzsoy,et al.  Scheduling a single batch processing machine with secondary resource constraints , 1998 .

[8]  Max Donath,et al.  American Control Conference , 1993 .

[9]  P. Ramadge,et al.  Periodicity and chaos from switched flow systems: contrasting examples of discretely controlled continuous systems , 1993, IEEE Trans. Autom. Control..

[10]  John Bean,et al.  Optimizing Supply-Chain Planning , 2005 .

[11]  Sweden. Sekretariatet för framtidsstudier,et al.  Beyond Belief: Randomness, Prediction and Explanation in Science , 1990 .

[12]  Karl G. Kempf,et al.  A MODEL PREDICTIVE CONTROL FRAMEWORK FOR ROBUST MANAGEMENT OF MULTI-PRODUCT, MULTI-ECHELON DEMAND NETWORKS , 2002 .

[13]  Karl G. Kempf,et al.  Supply Chain Collaboration Through Shared Capacity Models , 2006, Interfaces.

[14]  Mark S. Fox,et al.  Intelligent Scheduling , 1998 .

[15]  Ken Fisher,et al.  Managing Goods and Services Acquisition Risks , 2007 .

[16]  Jay Hopman,et al.  Managing Uncertainty in Planning and Forecasting , 2005 .

[17]  F. Erhun,et al.  The Art of Managing New Product Transitions , 2007 .

[18]  Karl Kempf The Spectrum of Risk Management in a Technology Company , 2007 .

[19]  Dana S. Nau,et al.  Artificial intelligence applications in manufacturing , 1992 .

[20]  Christian A. Ringhofer,et al.  A Continuum Model for a Re-entrant Factory , 2006, Oper. Res..

[21]  Janice Golda Managing New Technology Risk in the Supply Chain , 2007 .

[22]  Viswanath Vaidyanathan,et al.  Using Capacity Options to Better Enable Our Factory Ramps , 2005 .

[23]  K.G. Kempf,et al.  Application of model predictive control and optimization methods to semiconductor manufacturing supply-side inventory replenishment , 2005, ISSM 2005, IEEE International Symposium on Semiconductor Manufacturing, 2005..

[24]  R. Thietart,et al.  Action, Structure and Chaos , 1997 .

[25]  Karl G. Kempf,et al.  A hierarchical approach to production control of reentrant semiconductor manufacturing lines , 2003, IEEE Trans. Control. Syst. Technol..

[26]  R. Thietart,et al.  Chaos Theory and Organization , 1995 .

[27]  D.E. Rivera,et al.  Towards control-relevant forecasting in supply chain management , 2005, Proceedings of the 2005, American Control Conference, 2005..

[28]  John W. Fowler,et al.  Lot-to-order matching for a semiconductor assembly and test facility , 1999 .

[29]  G.E. Moore,et al.  Cramming More Components Onto Integrated Circuits , 1998, Proceedings of the IEEE.

[30]  Christopher D. Geiger,et al.  A Tabu search approach to scheduling an automated wet etch station , 1997 .

[31]  Hd Dieter Armbruster,et al.  Control and synchronization in switched arrival systems , 2003 .