Complexity and the Enterprise: The Illusion of Control
暂无分享,去创建一个
[1] Stephen F. Smith,et al. Exploiting Local Flexibility during Execution of Pre-Computed Schedules , 1990 .
[2] Reha Uzsoy,et al. Measures of subproblem criticality in decomposition algorithms for shop scheduling , 2003 .
[3] Eduardo F. Camacho,et al. Managing risk in semiconductor manufacturing: A stochastic predictive control approach , 2007 .
[4] Allison Goodman. Managing Product Development Risk , 2007 .
[5] T. Beaumariage,et al. The nature and origin of chaos in manufacturing systems , 1994, Proceedings of 1994 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop (ASMC).
[6] Dieter Armbruster,et al. Controlling a re-entrant manufacturing line via the push-pull point , 2008 .
[7] Reha Uzsoy,et al. Scheduling a single batch processing machine with secondary resource constraints , 1998 .
[8] Max Donath,et al. American Control Conference , 1993 .
[9] P. Ramadge,et al. Periodicity and chaos from switched flow systems: contrasting examples of discretely controlled continuous systems , 1993, IEEE Trans. Autom. Control..
[10] John Bean,et al. Optimizing Supply-Chain Planning , 2005 .
[11] Sweden. Sekretariatet för framtidsstudier,et al. Beyond Belief: Randomness, Prediction and Explanation in Science , 1990 .
[12] Karl G. Kempf,et al. A MODEL PREDICTIVE CONTROL FRAMEWORK FOR ROBUST MANAGEMENT OF MULTI-PRODUCT, MULTI-ECHELON DEMAND NETWORKS , 2002 .
[13] Karl G. Kempf,et al. Supply Chain Collaboration Through Shared Capacity Models , 2006, Interfaces.
[14] Mark S. Fox,et al. Intelligent Scheduling , 1998 .
[15] Ken Fisher,et al. Managing Goods and Services Acquisition Risks , 2007 .
[16] Jay Hopman,et al. Managing Uncertainty in Planning and Forecasting , 2005 .
[17] F. Erhun,et al. The Art of Managing New Product Transitions , 2007 .
[18] Karl Kempf. The Spectrum of Risk Management in a Technology Company , 2007 .
[19] Dana S. Nau,et al. Artificial intelligence applications in manufacturing , 1992 .
[20] Christian A. Ringhofer,et al. A Continuum Model for a Re-entrant Factory , 2006, Oper. Res..
[21] Janice Golda. Managing New Technology Risk in the Supply Chain , 2007 .
[22] Viswanath Vaidyanathan,et al. Using Capacity Options to Better Enable Our Factory Ramps , 2005 .
[23] K.G. Kempf,et al. Application of model predictive control and optimization methods to semiconductor manufacturing supply-side inventory replenishment , 2005, ISSM 2005, IEEE International Symposium on Semiconductor Manufacturing, 2005..
[24] R. Thietart,et al. Action, Structure and Chaos , 1997 .
[25] Karl G. Kempf,et al. A hierarchical approach to production control of reentrant semiconductor manufacturing lines , 2003, IEEE Trans. Control. Syst. Technol..
[26] R. Thietart,et al. Chaos Theory and Organization , 1995 .
[27] D.E. Rivera,et al. Towards control-relevant forecasting in supply chain management , 2005, Proceedings of the 2005, American Control Conference, 2005..
[28] John W. Fowler,et al. Lot-to-order matching for a semiconductor assembly and test facility , 1999 .
[29] G.E. Moore,et al. Cramming More Components Onto Integrated Circuits , 1998, Proceedings of the IEEE.
[30] Christopher D. Geiger,et al. A Tabu search approach to scheduling an automated wet etch station , 1997 .
[31] Hd Dieter Armbruster,et al. Control and synchronization in switched arrival systems , 2003 .