A joint economic lot size model with price and environmentally sensitive demand
暂无分享,去创建一个
[1] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[2] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[3] S. Goyal. “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .
[4] S. C. Choi,et al. Price Competition in a Channel Structure with a Common Retailer , 1991 .
[5] Carol Reeves,et al. DEFINING QUALITY: ALTERNATIVES AND IMPLICATIONS , 1994 .
[6] Economic aspects of environmental investment in plant facilities , 1996 .
[7] R. Klassen,et al. The impact of environmental management on firm performance , 1996 .
[8] Rajiv D. Banker,et al. Quality and Competition , 1998 .
[9] Andy A. Tsay,et al. Channel Dynamics Under Price and Service Competition , 2000, Manuf. Serv. Oper. Manag..
[10] Sila Çetinkaya,et al. The Buyer-Vendor Coordination Problem: Modeling Inbound and Outbound Cargo Capacity and Costs , 2003 .
[11] Douglas M. Lambert,et al. Supply Chain Management: Processes, Partnerships, Performance , 2004 .
[12] Nicola J Beaumont,et al. Abatement cost curves: a viable management tool for enabling the achievement of win-win waste reduction strategies? , 2004, Journal of environmental management.
[13] L. Ouyang,et al. Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .
[14] R. Dellink,et al. Dynamic modelling of pollution abatement in a CGE framework , 2004 .
[15] P. Rao,et al. Do green supply chains lead to competitiveness and economic performance , 2005 .
[16] Suresh Kumar Goyal,et al. A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer , 2006 .
[17] Mohamad Y. Jaber,et al. Coordinating a two-level supply chain with delay in payments and profit sharing , 2006, Comput. Ind. Eng..
[18] I. Osman,et al. Coordinating a three-level supply chain with price discounts, price dependent demand, and profit sharing , 2006 .
[19] R. M. Hill,et al. Another look at the single-vendor single-buyer integrated production-inventory problem , 2006 .
[20] Chonghui Guo,et al. Channel coordination and volume discounts with price-sensitive demand , 2007 .
[21] M. Darwish,et al. Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..
[22] A. Stefan,et al. Does It Pay to Be Green? A Systematic Overview , 2008 .
[23] S. Zolfaghari,et al. Quantitative Models for Centralised Supply Chain Coordination , 2008 .
[24] Mohammad Reza Akbari Jokar,et al. Optimizing shipment, ordering and pricing policies in a two-stage supply chain with price-sensitive demand , 2009 .
[25] Joseph F. DeCarolis,et al. A bottom-up method to develop pollution abatement cost curves for coal-fired utility boilers , 2010 .
[26] M. Wahab,et al. EOQ models for a coordinated two-level international supply chain considering imperfect items and environmental impact , 2011 .
[27] Maurice Bonney,et al. Environmental performance measures for supply chains , 2011 .
[28] M. Jaber,et al. Environmentally responsible inventory models: Non-classical models for a non-classical era , 2011 .
[29] M. Jaber,et al. Sustainability strategies in an EPQ model with price- and quality-sensitive demand , 2012 .
[30] C. Glock. The joint economic lot size problem: A review , 2012 .
[31] M. Jaber,et al. Closed-loop supply chain system with energy, transportation and waste disposal costs , 2013 .
[32] M. Jaber,et al. Supply chain coordination with emissions reduction incentives , 2013 .
[33] M. Jaber,et al. Vendor-managed inventory with consignment stock agreement for single vendor–single buyer under the emission-trading scheme , 2014 .
[34] M. Jaber,et al. A consignment stock coordination scheme for the production, remanufacturing and waste disposal problem , 2014 .
[35] R. W. Grubbström,et al. A century of evolution from Harris׳s basic lot size model: Survey and research agenda , 2014 .