Life cycle costing: evaluating its use in UK practice

Purpose – The purpose of this paper is to establish the extent to which life cycle costing (LCC) is used as an early stage project evaluation tool by practitioners in the UK construction industry. The use of this evaluation tool has long been advocated by academics as a means of ensuring best value rather than lowest cost is a driver for business decisions related to potential built environment projects. Therefore there is a need to appraise its current uptake levels amongst built environment professionals and assess whether there are any barriers affecting its use in UK practice. Design/methodology/approach – Using a mixed methods approach, the authors present the findings from a survey of construction professionals located in the UK and the results from a series of follow up semi-structured interviews designed to further explore the factors found to affect the use of LCC in practice. Findings – The study shows that LCC is still not widely used by built environment professionals in the UK. The greatest i...

[1]  A Huvstig,et al.  WHOLE LIFE COSTING , 1999 .

[2]  S. Austin,et al.  Never waste a good crisis: a review of progress since Rethinking Construction and thoughts for our future , 2009 .

[3]  L. Swaffield,et al.  The contractor's use of life cycle costing on PFI projects , 2008 .

[4]  Christos L. Galanos,et al.  Commercial property whole-life costing and the taxation environment , 2014 .

[5]  M. Patton,et al.  Qualitative evaluation and research methods , 1992 .

[6]  Derek Clements-Croome,et al.  Reliability in the whole life cycle of building systems , 2006 .

[7]  Pernilla Gluch,et al.  The life cycle costing (LCC) approach: a conceptual discussion of its usefulness for environmental decision-making , 2004 .

[8]  Xianhai Meng,et al.  The application of whole life costing in PFI/PPP projects , 2013 .

[9]  John W. Bull,et al.  Life Cycle Costing for Construction , 2003 .

[10]  Ghassan Aouad,et al.  An integrated environment for life cycle costing in construction , 2003 .

[11]  Richard Fellows,et al.  New research paradigms in the built environment , 2010 .

[12]  Richard Kirkham,et al.  Re‐engineering the whole life cycle costing process , 2005 .

[13]  Lu Aye,et al.  Environmentally sustainable development: a life-cycle costing approach for a commercial office building in Melbourne, Australia , 2000 .

[14]  Mohammed Kishk,et al.  Combining various facets of uncertainty in whole‐life cost modelling , 2004 .

[15]  Annekatrin Lehmann,et al.  Life Cycle Costing in Sustainability Assessment—A Case Study of Remanufactured Alternators , 2011 .

[16]  Mohammed Kishk,et al.  AN EXTENDED WHOLE-LIFE APPLICATION FOR THE SELECTION OF HOSPITAL FINISHES , 2006 .

[17]  Alex Opoku,et al.  The Application of Whole Life Costing in the UK Construction Industry: Benefits and Barriers , 2013 .

[18]  Rod Gameson,et al.  THE CONSIDERATION OF MAINTENANCE ISSUES DURING THE DESIGN PROCESS IN THE UK PUBLIC SECTOR , 2010 .

[19]  Eva Sterner,et al.  Life-cycle costing and its use in the Swedish building sector , 2000 .

[20]  Appu Haapio,et al.  A critical review of building environmental assessment tools , 2008 .

[21]  Wen-Hsien Tsai,et al.  An Activity-Based Costing decision model for life cycle assessment in green building projects , 2014, Eur. J. Oper. Res..

[22]  A. Onwuegbuzie,et al.  Mixed Methods Research: A Research Paradigm Whose Time Has Come , 2004 .

[23]  Raymond J. Cole,et al.  Reconciling theory and practice of life-cycle costing , 2000 .

[24]  John W. Creswell,et al.  Research Design: Qualitative, Quantitative, and Mixed Methods Approaches , 2010 .

[25]  Richard Kirkham,et al.  Rethinking whole life cycle cost based design decision making , 2004 .

[26]  A. Oladapo,et al.  An appraisal of the level of application of life cycle costing within the construction industry in the UK , 2010 .

[27]  H. Rubin,et al.  Qualitative Interviewing (2nd ed.): The Art of Hearing Data , 2005 .

[28]  Chris Fortune,et al.  Current practices in building project contract price forecasting in the UK , 2005 .

[29]  Peter Caplehorn Whole Life Costing: A New Approach , 2012 .

[30]  Ghassan Aouad,et al.  Effective feedback of whole-life data to the design process. , 2003 .

[31]  B. Dhillon Life Cycle Costing , 1999 .

[32]  Luís Bragança,et al.  Building Sustainability Assessment , 2010 .

[33]  R. B. Johnson,et al.  Educational Research: Quantitative, Qualitative, and Mixed Approaches , 2007 .

[34]  Grace K C Ding,et al.  Sustainable construction--the role of environmental assessment tools. , 2008, Journal of environmental management.