Relations between Production of CBM and Water Discharge in Initial Production
暂无分享,去创建一个
Improving the productivity of CBM wells is one of the most emergency issues in the development of CBM. Preliminary characteristics of water discharge can indicate the productivity to some extent. Based on the data of 49 CBM wells in Fanzhuang Block, Qinshui basin, this paper makes research on the relations between the Preliminary characteristics of water discharge and CBM well production by theory of reservoir engineering. According to the index and quantity of water discharge, the CBM wells were divided into five types. Contrast this block, develop the I-type wells preferentially, reduce the fracture strength for the II-type wells, improve the fracturing technology for the IV-type wells, and shouldnt take the III & V-type wells into consideration generally.
[1] Xu Hong-jie. Key geologic factors and control mechanisms of water production and gas production divergences between CBM wells in Fanzhuang block , 2013 .
[2] Xian Bao-an,et al. Analysis on applied mechanism of multiple laterals horizontal well in developing coalbed methane , 2005 .
[3] Wu Jian-guang,et al. REASONABLE PRODUCTION INTENSITY OF COAL-BED METHANE WELLS IN INITIAL PRODUCTION , 2007 .
[4] Zhang Mingshan. Analysis of application status and adapting conditions for different methods of CBM development , 2010 .