Coordinative scheduling problem of single machine manufacturing and delivery with due date windows
暂无分享,去创建一个
[1] Chung-Yee Lee,et al. Machine scheduling with job delivery coordination , 2004, Eur. J. Oper. Res..
[2] Ik Sun Lee,et al. Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed , 2008, Eur. J. Oper. Res..
[3] Christos Koulamas. Single-machine scheduling with time windows and earliness/tardiness penalties , 1996 .
[4] Igor Averbakh,et al. On-line supply chain scheduling problems with preemption , 2007, Eur. J. Oper. Res..
[5] Zhi-Long Chen,et al. Machine scheduling with transportation considerations , 2001 .
[6] Chris N. Potts,et al. Supply chain scheduling: Batching and delivery , 2003, Oper. Res..
[7] Chung-Lun Li,et al. Machine scheduling with deliveries to multiple customer locations , 2005, Eur. J. Oper. Res..
[8] Xu Hai-tao. Research on integrated scheduling algorithm for 3-tier supply chain , 2006 .
[9] Alessandro Agnetis,et al. Supply chain scheduling: Sequence coordination , 2006, Discret. Appl. Math..
[10] Zhiyi Tan,et al. On the machine scheduling problem with job delivery coordination , 2007, Eur. J. Oper. Res..
[11] George L. Vairaktarakis,et al. Integrated Scheduling of Production and Distribution Operations , 2005, Manag. Sci..
[12] Tang Hua-li. Batch scheduling of a multi-stage supply chain with due windows , 2007 .
[13] Jose A. Ventura,et al. Single machine scheduling with symmetric earliness and tardiness penalties , 2003, Eur. J. Oper. Res..