Multi-stage goal programming models for production optimization in the middle and later periods of oilfield development

The present paper proposes two weighted goal-programming models for optimizing crude oil production in the middle and later periods of oilfield development. These models divide the oil yield optimization problem into two stages according to the characteristics of Chinese oil companies’ yield compositions. In the first stage, the total planned crude oil yield will be optimized by four sub-yields, while each sub-yield will be allocated optimally among different oil extract plants in the later stage. A case study is conducted to validate the proposed models. The results show that the model can address the annual crude oil yield planning subjectively. Moreover, the proposed model can rationally allocate resources among various extract oil plants and effectively reduce production costs in the context of ensuring planned oil yields.

[1]  M. Schniederjans,et al.  Using the analytic hierarchy process and multi-objective programming for the selection of cost drivers in activity-based costing , 1997, Eur. J. Oper. Res..

[2]  Liu Zhi-bin Optimal model for oil production composition of oilfield development programming and its application , 2004 .

[3]  Lars Imsland,et al.  Short-Term Production Optimization of Offshore Oil and Gas Production Using Nonlinear Model Predictive Control , 2011 .

[4]  Li Yang Researches and Application of Oil Field Production Development Plan Model , 2012 .

[5]  Eduardo Camponogara,et al.  A computational analysis of multidimensional piecewise-linear models with applications to oil production optimization , 2014, Eur. J. Oper. Res..

[6]  Abraham Charnes,et al.  Optimal Estimation of Executive Compensation by Linear Programming , 1955 .

[7]  J. Barzilai Deriving weights from pairwise comparison matrices , 1997 .

[8]  LU Yan-ping Economic Efficiency Forecast and Latter Appraises Studies about Mid and Late Period Measure Investment of Oil-Field Development , 2012 .

[9]  Sanjay Sharma,et al.  An integrative supplier selection model using Taguchi loss function, TOPSIS and multi criteria goal programming , 2013, J. Intell. Manuf..

[10]  Mehrdad Tamiz,et al.  A Review of Goal Programming for Portfolio Selection , 2010 .

[11]  中華人民共和国国家統計局 China statistical yearbook , 1988 .

[12]  Davide La Torre,et al.  Financial portfolio management through the goal programming model: Current state-of-the-art , 2014, Eur. J. Oper. Res..

[13]  Pooya Soltantabar Annual Energy Outlook , 2015 .

[14]  Begoña Vitoriano,et al.  A goal programming approach for farm planning with resources dimensionality , 2011, Ann. Oper. Res..

[15]  Seyed Hossein Iranmanesh,et al.  Optimal planning of oil and gas development projects considering long-term production and transmission , 2014, Comput. Chem. Eng..

[16]  Chunrong,et al.  China's Oil and Gas Imports and Exports in 2012 , 2013 .

[17]  Shang Ming Non-linear optimal modeling of production manipulation and its application , 2003 .

[18]  K. I. M. McKinnon,et al.  Oil production optimization solved by piecewise linearization in a Branch & Price framework , 2012, Comput. Oper. Res..

[19]  Bjarne A. Foss,et al.  Dantzig-Wolfe decomposition for real-time optimization - applied to the Troll west oil rim , 2009 .

[20]  Marielle Christiansen,et al.  Modeling Norwegian petroleum productionand transportation , 1998, Ann. Oper. Res..

[21]  Louis J. Durlofsky,et al.  Application of derivative-free methodologies to generally constrained oil production optimisation problems , 2011, Int. J. Math. Model. Numer. Optimisation.

[22]  Wei-Chih Wang,et al.  AHP- and simulation-based budget determination procedure for public building construction projects , 2008 .