Study on the Selection of Subcontractors Based on Fuzzy Comprehensive Evaluation
暂无分享,去创建一个
From the point view of the general contractor, we can analysis of the various factors which affect the selection of subcontractors and construct them as the basis for the comprehensive evaluation index system of the subcontractors’ capacity risks. Then we can use Fuzzy Comprehensive Evaluation method to put forward the selection of subcontractors based on Fuzzy Comprehensive Evaluation. Finally, we list some engineering project examples to verify the feasibility and practical of the comprehensive evaluation system to provide references and recommendation for general contractor on evaluation and selection of subcontractors.
[1] Mukhtiar Singh. ADAPTIVE NETWORK-BASED FUZZY INFERENCE SYSTEMS FOR SENSORLESS CONTROL OF PMSG BASED WIND TURBINE WITH POWER QUALITY IMPROVEMENT FEATURES , 2010 .
[2] Jyh-Shing Roger Jang,et al. ANFIS: adaptive-network-based fuzzy inference system , 1993, IEEE Trans. Syst. Man Cybern..
[3] Yang Mao-sheng. Research of real estate investment risk based on the fuzzy comprehensive evaluation , 2009 .
[4] M. Sugeno,et al. Structure identification of fuzzy model , 1988 .