Flow shop scheduling algorithm to optimize warehouse activities
暂无分享,去创建一个
Piera Centobelli | Liberatina Carmela Santillo | Teresa Murino | Giuseppe Converso | L. Santillo | Giuseppe Converso | T. Murino | Piera Centobelli
[1] L. Gelders,et al. Four simple heuristics for scheduling a flow-shop , 1978 .
[2] Jose M. Framiñan,et al. A review and classification of heuristics for permutation flow-shop scheduling with makespan objective , 2004, J. Oper. Res. Soc..
[3] Mariagrazia Dotoli,et al. An integrated approach for warehouse analysis and optimization: A case study , 2015, Comput. Ind..
[4] Hitoshi Tsubone,et al. Production and scheduling system in the flow shop , 1988 .
[5] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[6] João Vitor Moccellin,et al. A New Heuristic Method for the Permutation Flow Shop Scheduling Problem , 1995 .
[7] A. Hertz,et al. A new heuristic method for the flow shop sequencing problem , 1989 .
[8] Graham McMahon,et al. The two-machine flow shop problem with arbitrary precedence relations , 1993 .
[9] R. A. Dudek,et al. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem , 1970 .
[10] Ziaul Huq,et al. The sensitivity of rule combinations for scheduling in a hybrid job shop , 1995 .
[11] Marcello Braglia,et al. A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness , 2009 .
[12] C. Rajendran. Heuristics for scheduling in flowshop with multiple objectives , 1995 .
[13] Hitoshi Tsubone,et al. The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop , 1996 .
[14] Peter A. Pinto,et al. Joint lot-sizing and scheduling for multi-stage multi-product flow shops , 1992 .
[15] Oded Berman,et al. A Simple Heuristic for m-Machine Flow-Shop and its Applications in Routing-Scheduling Problems , 1999, Oper. Res..
[16] Wei Wang,et al. General modeling and simulation for enterprise operational decision-making problem: A policy-combination perspective , 2012, Simul. Model. Pract. Theory.
[17] Jatinder N. D. Gupta,et al. A Functional Heuristic Algorithm for the Flowshop Scheduling Problem , 1971 .
[18] Alix Munier. The complexity of a cyclic scheduling problem with identical machines and precedence constraints , 1996 .
[19] Beatriz Murrieta Cortés,et al. Multi-objective flow-shop scheduling with parallel machines , 2012 .
[20] Ali Allahverdi,et al. A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness , 2004, Comput. Oper. Res..
[21] Chandrasekharan Rajendran,et al. A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs , 2005, Eur. J. Oper. Res..
[22] A. S. Spachis,et al. Heuristics for flow-shop scheduling , 1980 .
[23] Jatinder N. D. Gupta,et al. Local search heuristics for two-stage flow shop problems with secondary criterion , 2002, Comput. Oper. Res..
[24] Khalil S. Hindi,et al. Detailed scheduling for a class of two-stage intermittent manufacturing systems , 1992 .
[25] Jan Karel Lenstra,et al. PREEMPTIVE SCHEDULING IN A TWO-STAGE MULTIPROCESSOR FLOW SHOP IS NP-HARD , 1996 .
[26] Jose M. Framiñan,et al. Production , Manufacturing and Logistics Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation , 2002 .
[27] Chelliah Sriskandarajah,et al. The complexity of scheduling jobs in repetitive manufacturing systems , 1993 .
[28] Serol Bulkan,et al. Comparison of Genetic Algorithm and Particle Swarm Optimization for Bicriteria Permutation Flowshop Scheduling Problem , 2008 .
[29] Robert J. Wittrock,et al. An Adaptable Scheduling Algorithm for Flexible Flow Lines , 1988, Oper. Res..
[30] Seetharama L. Narasimhan,et al. A COMPARISON OF SEQUENCING RULES FOR A TWO‐STATE HYBRID FLOW SHOP , 1987 .
[31] C.-J. Liao,et al. Bicriterion scheduling in the two-machine flowshop , 1997 .
[32] Candace Arai Yano,et al. Cyclic scheduling to minimize inventory in a batch flow line , 1994 .
[33] Seetuarma L. Narastmhan,et al. Scheduling in a two-stage manufacturing process , 1984 .
[34] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[35] Thom J. Hodgson,et al. Optimal hybrid push/pull control strategies for a parallel multistage system: Part II , 1991 .
[36] Hamid Davoud Pour. A new heuristic for the n-job, m-machine flow-shop problem , 2001 .
[37] Pankaj Chandra,et al. Permutation flow shop scheduling with earliness and tardiness penalties , 2004 .
[38] J. Kamburowski,et al. On the NEH heuristic for minimizing the makespan in permutation flow shops , 2007 .
[39] Gupta J.N.D.. TWO-STAGE HYBRID FLOW SHOP SCHEDULING PROBLEM , 1988 .
[40] Riccardo Manzini,et al. A decision-support system for the design and management of warehousing systems , 2014, Comput. Ind..
[41] Venkata Ranga Neppalli,et al. Minimizing total flow time in a two-machine flowshop problem with minimum makespan , 2001 .
[42] Kut C. So,et al. Some heuristics for scheduling jobs on parallel machines with setups , 1990 .
[43] Chandrasekharan Rajendran,et al. A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria , 1994 .
[44] A. Guinet. Scheduling sequence-dependent jobs on identical parallel machines to minimize completion time criteria , 1993 .
[45] Claire Hanen,et al. Study of a NP-hard cyclic scheduling problem: The recurrent job-shop , 1994 .
[46] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[47] Neil Collier,et al. Scenario modelling to support industry strategic planning and decision making , 2014, Environ. Model. Softw..
[48] Said Ashour. A MODIFIED DECOMPOSITION ALGORITHM FOR SCHEDULING PROBLEMS , 1970 .
[49] Pandu R. Tadikamalla,et al. An integrated approach for production planning—A case study , 1991 .
[50] D. S. Palmer. Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum , 1965 .
[51] A. Noorul Haq,et al. A bicriterian flow shop scheduling using artificial neural network , 2006 .
[52] Hisao Ishibuchi,et al. Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling , 2003, IEEE Trans. Evol. Comput..
[53] R. Uzsoy. Scheduling a single batch processing machine with non-identical job sizes , 1994 .
[54] H Tsubone,et al. A production scheduling system for a hybrid flow shop--a case study , 1993 .
[55] Sunderesh S. Heragu,et al. A Branch-and-Bound Approach for a Two-machine Flowshop Scheduling Problem , 1995 .
[56] J E C Arroyo,et al. A partial enumeration heuristic for multi-objective flowshop scheduling problems , 2004, J. Oper. Res. Soc..
[57] Said Ashour. A DECOMPOSITION APPROACH FOR THE MACHINE SCHEDULING PROBLEM , 1967 .
[58] Bahram Alidaee,et al. Two parallel machine sequencing problems involving controllable job processing times , 1993 .
[59] Yoichi Miyake,et al. Production scheduling system in the hybrid flow shop , 1993 .
[60] Wenxin Liu,et al. A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment , 2005, J. Intell. Manuf..
[61] Ertan Güner,et al. The tricriteria flowshop scheduling problem , 2008 .
[62] Dean H. Kropp,et al. Lot Splitting in Stochastic Flow Shop and Job Shop Environments , 1996 .
[63] F. Robert Jacobs,et al. REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .
[64] S. S. Panwalkar,et al. Scheduling of a Two-machine Flowshop with Travel Time Between Machines , 1991 .
[65] J. A. Muckstadt,et al. An approach to production planning and scheduling in cyclically scheduled manufacturing systems , 1994 .
[66] Robert W. Hall. Cyclic scheduling for improvement , 1988 .
[67] David D. Bedworth,et al. Flow shop scheduling in serial multi-product processes with transfer and set-up times , 1992 .
[68] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[69] C. Dennis Pegden,et al. A survey and evaluation of static flowshop scheduling heuristics , 1984 .
[70] Jatinder N. D. Gupta,et al. Flow-shop scheduling by heuristic decomposition , 1973 .
[71] M. Solomon,et al. Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time , 1996 .
[72] R. J. Paul. A Production Scheduling Problem in the Glass-Container Industry , 1979, Oper. Res..
[73] Jose M. Framiñan,et al. A multi-objective iterated greedy search for flowshop scheduling with makespan and flowtime criteria , 2008, OR Spectr..
[74] Jatinder N. D. Gupta,et al. Heuristic Algorithms for Multistage Flowshop Scheduling Problem , 1972 .
[75] Armen Bagdasaryan,et al. Discrete dynamic simulation models and technique for complex control systems , 2011, Simul. Model. Pract. Theory.
[76] J. Gupta,et al. Schedules for a two-stage hybrid flowshop with parallel machines at the second stage , 1991 .
[77] Helena Ramalhinho Dias Lourenço,et al. Sevast'yanov's algorithm for the flow-shop scheduling problem , 1996 .