Benefits of lot splitting in job-shop scheduling
暂无分享,去创建一个
[1] Kenneth R. Baker,et al. A comparative study of lot streaming procedures , 1993 .
[2] Stephen C. Graves,et al. Overlapping operations in material requirements planning , 1986 .
[3] Chris N. Potts,et al. Lot streaming in three-stage production processes , 1994 .
[4] Egon Balas,et al. Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration Algorithm , 1969, Oper. Res..
[5] Alper Sen,et al. Optimal streaming of a single job in a two-stage flow shop , 1998, Eur. J. Oper. Res..
[6] Dean H. Kropp,et al. Optimal and Heuristic Models for Lot Splitting in a Flow Shop , 1990 .
[7] Subhash C. Sarin,et al. Evaluation of the potential benefits of lot streaming in flow-shop systems , 2000 .
[8] David F. Pyke,et al. Solution Procedures for the Lot‐Streaming Problem , 1990 .
[9] F. Can Çinkaya,et al. Unit sized transfer batch scheduling with setup times , 1992 .
[10] Gary L. Ragatz,et al. The impact of lot splitting on due date performance , 1994 .
[11] Terence M. Hancock. Effects of Lot‐splitting under Various Routing Strategies , 1991 .
[12] Kenneth R. Baker,et al. Basic Techniques for Lot Streaming , 1993, Oper. Res..
[13] Stéphane Dauzère-Pérès,et al. An iterative procedure for lot streaming in job-shop scheduling , 1993 .
[14] R. G. Vickson,et al. Two- and three-machine flow shop scheduling problems with equal sized transfer batches , 1992 .
[15] Jaya P. Moily,et al. Optimal and heuristic procedures for component log-splitting in multi-stage manufacturing systems , 1986 .
[16] F. Robert Jacobs,et al. REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .
[17] Chinyao Low,et al. Mathematical modelling and heuristic approaches to operation scheduling problems in an FMS environment , 2001 .
[18] Iftekhar A. Karimi. Optimal cycle times in multistage serial systems with set-up and inventory costs , 1992 .