Framework for enhanced progress tracking and control of linear projects
暂无分享,去创建一个
[1] Tarek Hegazy,et al. Efficient Repetitive Scheduling for High-Rise Construction , 2008 .
[2] Rafael Sacks,et al. Assessing research issues in Automated Project Performance Control (APPC) , 2007 .
[3] I-Tung Yang,et al. Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding , 2005 .
[4] Kyuman Cho,et al. Scheduling model for repetitive construction processes for high-rise buildings , 2011 .
[5] Emad Elbeltagi,et al. Integrated visualized time control system for repetitive construction projects , 2011 .
[6] Tarek Hegazy. Computerized System for Efficient Scheduling of Highway Construction , 2005 .
[7] Kuo-Shun Sun,et al. Non-Unit-Based Planning and Scheduling of Repetitive Construction Projects , 2004 .
[8] Osama Moselhi,et al. Accelerating linear projects , 2005 .
[9] Maged Georgy,et al. Evolutionary resource scheduler for linear projects , 2008 .
[10] Osama Moselhi,et al. Integrating Automated Data Acquisition Technologies for Progress Reporting of Construction Projects , 2009 .
[11] Tarek Hegazy,et al. Email-based system for documenting construction as-built details , 2012 .
[12] Richard Neale,et al. CPM/LOB: New Methodology to Integrate CPM and Line of Balance , 1994 .
[13] Rehab Reda,et al. RPM: Repetitive Project Modeling , 1990 .
[14] Tarek Hegazy,et al. Critical Path Segments Scheduling Technique , 2010 .
[15] Olli Seppänen,et al. Location-Based Management for Construction: Planning, scheduling and control , 2006 .
[16] Shu-Shun Liu,et al. Two‐stage profit optimization model for linear scheduling problems considering cash flow , 2009 .
[17] Pandelis G. Ipsilandis,et al. Multiobjective optimization in Linear Repetitive Project scheduling , 2006, Oper. Res..
[18] Cheng Zhang,et al. Mobile Model‐Based Bridge Lifecycle Management System , 2006, Comput. Aided Civ. Infrastructure Eng..
[19] Ming-Kuan Tsai,et al. Improving communication barriers for on-site information flow: An exploratory study , 2009, Adv. Eng. Informatics.
[20] Tarek Hegazy. Computerized System for Efficient Delivery of Infrastructure Maintenance/Repair Programs , 2006 .
[21] Zhili Gao,et al. Developing a Traffic Closure Integrated Linear Schedule for Highway Rehabilitation Projects , 2009 .
[22] Chun-Hsiung Liao,et al. Influential Factors of VoIP Adoption of Top 500 Export-import Enterprises in Taiwan , 2010 .
[23] A. Samer Ezeldin,et al. Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects , 2009 .