Development Framework of an Artificial Intelligence Planner Framework for Bespoke Precast Concrete Production
暂无分享,去创建一个
[1] Tarek Hegazy,et al. DBID: Analogy‐Based DSS for Bidding in Construction , 1993 .
[2] Hojjat Adeli,et al. Regularization neural network for construction cost estimation , 1998 .
[3] Wallace J. Hopp,et al. Factory physics : foundations of manufacturing management , 1996 .
[4] Sou-Sen Leu,et al. Ga-based resource-constrained flow-shop scheduling model for mixed precast production , 2002 .
[5] Lucio Soibelman,et al. Generating Construction Knowledge with Knowledge Discovery in Databases , 2000 .
[6] Carlos T. Formoso,et al. Method for Waste Control in the Building Industry , 1999 .
[7] Nico Vandaele,et al. Advanced Resource Planning , 2003 .
[8] Lauri Koskela,et al. Management of production in construction: A theoretical view , 1999 .
[9] Tarek Hegazy,et al. Neural networks as tools in construction , 1991 .
[10] Glenn Ballard,et al. An application of lean concepts and techniques to precast concrete fabrication , 2002 .
[11] Weng Tat Chan,et al. Production Scheduling for Precast Plants using a Flow Shop Sequencing Model , 2002 .
[12] Chi Ming Tam,et al. Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes , 2001 .
[13] Miroslaw J. Skibniewski,et al. Estimating construction productivity: neural-network-based approach , 1994 .
[14] Philip D. Wasserman,et al. Neural computing - theory and practice , 1989 .