Uncertainty and contingency plans in ERP-controlled manufacturing environments

Purpose – This research aims to determine to what extent uncertainties affected manufacturing enterprises' delivery performance, to analyse the performance of their contingency plans in dealing with uncertainties and to explore what technical and organisational factors affected managers' decisions to implement an uncertainty‐diagnosing model.Design/methodology/approach – The methodology included a literature review, postal questionnaire survey and telephone interviews.Findings – A total of 30 companies responded to the questionnaire, 56 per cent of which thought their systems worked well and 80 per cent reported that material shortages were responsible for tardy delivery performance. Tardy delivery was directly or indirectly caused by poor supplier delivery performance in the opinion of 92 per cent of respondents. Seven companies had developed an uncertainty‐diagnosing model. Not all companies needed to adopt the model.Research limitations/implications – Uncertainty and contingency plans were investigated...

[1]  Thomas H. Davenport,et al.  Mission Critical: Realizing the Promise of Enterprise Systems , 2000 .

[2]  Andrew D. Brown Implementing MRPII: Leadership, Rites and Cognitive Change , 1994 .

[3]  S. C. L. Koh MRP-controlled batch-manufacturing environment under uncertainty , 2004, J. Oper. Res. Soc..

[4]  Chris W. Clegg,et al.  Problems integrating user participation into software development , 1997, Int. J. Hum. Comput. Stud..

[5]  Jeffrey Miller Hedging the master schedule , 1979 .

[6]  T. C. Ireland,et al.  Correlating MRP system nervousness with forecast errors , 1998 .

[7]  P. C. Pandey,et al.  Lead time adjustment through scrap management , 1998 .

[8]  Candace Arai Yano,et al.  Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems , 1987 .

[9]  Angappa Gunasekaran,et al.  Issues in implementing ERP: A case study , 2003, Eur. J. Oper. Res..

[10]  William L. Berry,et al.  Manufacturing Planning and Control Systems , 1984 .

[11]  Sameh M. Saad,et al.  Development of a business model for diagnosing uncertainty in ERP environments , 2002 .

[12]  Thomas G. Schmitt Resolving uncertainty in manufacturing systems , 1984 .

[13]  D. Clay Whybark,et al.  MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .

[14]  B. W. Taylor,et al.  A simulation-based experimental investigation of supply/timing uncertainty in MRP systems , 1984 .

[15]  John A. Buzacott,et al.  Safety stock versus safety time in MRP controlled production systems , 1994 .

[16]  Colin New,et al.  MRP with high uncertain yield losses , 1984 .

[17]  Roger G. Dear,et al.  Managing Uncertainty in Multilevel Manufacturing Systems , 1991 .

[18]  M. Al-Mashari Enterprise resource planning (ERP) systems: a research agenda , 2002 .

[19]  Andrew Hede,et al.  Resistance to organisational change: the role of defence mechanisms , 2001 .

[20]  Satya S. Chakravorty,et al.  Does Protective Capacity Assist Managers in Competing Along Time-Based Dimensions? , 1994 .

[21]  Neil F. Doherty,et al.  The importance of organisational issues in systems development , 1998, Inf. Technol. People.

[22]  R. C. Carlson,et al.  An analysis of scheduling policies in multiechelon production systems , 1985 .

[23]  Sameh M. Saad,et al.  Uncertainty under MRP-planned manufacture: Review and categorization , 2002 .

[24]  Jc Johan Wortmann,et al.  MRP and inventories , 1985 .

[25]  J. Wacker A theory of material requirements planning (MRP): an empirical methodology to reduce uncertainty in MRP systems , 1985 .

[26]  H. Roberts,et al.  New Office Information Technology: Human and Managerial Implications. , 1989 .

[27]  R. Lawrence LaForge,et al.  A model to estimate service levels when a portion of the master production schedule is frozen , 1994, Comput. Oper. Res..

[28]  T. C. Loh,et al.  Critical elements for a successful enterprise resource planning implementation in small-and medium-sized enterprises , 2004 .

[29]  V. D. R. Guide,et al.  A review of techniques for buffering against uncertainty with MRP systems , 2000 .

[30]  Sock H. Chung,et al.  ERP adoption: a technological evolution approach , 2000 .

[31]  Ludo Gelders,et al.  Lot sizing and safety stock decisions in an MRP system with demand uncertainty , 1982 .

[32]  Angappa Gunasekaran,et al.  Measuring uncertainties in MRP environments , 2000 .

[33]  Jeff Hoi Yan Yeung,et al.  Parameters affecting the effectiveness of MRP systems: A review , 1998 .

[34]  Marinos Themistocleous,et al.  Integrating diverse ERP systems: a case study , 2004, J. Enterp. Inf. Manag..

[35]  D. N. P. Murthy,et al.  MRP with uncertainty: a review and some extensions , 1991 .

[36]  Sameh M. Saad,et al.  The use of intelligent feedback for work order release in an uncertain manufacturing system , 2004 .

[37]  V. Sridharan,et al.  Master production scheduling make-to-stock products: a framework for analysis , 1990 .

[38]  Chrwan‐jyh Ho,et al.  Evaluating Lot‐sizing Performance in Multi‐level MRP Systems: A Comparative Analysis of Multiple Performance Measures , 1993 .

[39]  H. Klein,et al.  Information systems development as social action: Theoretical perspective and practice , 1991 .

[40]  David E. Avison,et al.  Information systems development methodologies: a classification according to problem situation , 1997, J. Inf. Technol..

[41]  Timothy D. Fry,et al.  Comparisons between drum–buffer–rope and material requirements planning: a case study , 2005 .

[42]  Richard Metters,et al.  Adapting lot-sizing techniques to stochastic demand through production scheduling policy , 1996 .