Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns
暂无分享,去创建一个
[1] Mohan Raj Manavazhi,et al. Productivity oriented analysis of design revisions , 2001 .
[2] Søren L. Buhl,et al. How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation , 2005, 1303.6654.
[3] David J. Edwards,et al. Forensic Project Management: An Exploratory Examination of the Causal Behavior of Design-Induced Rework , 2008, IEEE Transactions on Engineering Management.
[4] Søren L. Buhl,et al. What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.
[5] John Bell,et al. Causation and Causal Conditionals , 2004, KR.
[6] R. Yin. Case Study Research: Design and Methods , 1984 .
[7] David J. Edwards,et al. Project Pathogens: The Anatomy of Omission Errors in Construction and Resource Engineering Project , 2009, IEEE Transactions on Engineering Management.
[8] Franz von Kutschera,et al. Causation , 1993, J. Philos. Log..
[9] Peter E.D. Love,et al. Congruence or divergence? A path model of rework for building and civil engineering projects , 2009 .
[10] Christopher R. Hitchcock. The Intransitivity of Causation Revealed In Equations and Graphs , 2001 .
[11] Bent Flyvbjerg,et al. Curbing Optimism Bias and Strategic Misrepresentation in Planning: Reference Class Forecasting in Practice , 2008 .
[12] Charles C. Ragin,et al. Constructing social research :the unity and diversity of method , 1996 .
[13] Jeremy Busby,et al. Projects, pathogens and incubation periods , 2004 .
[14] John Bell,et al. Natural Events , 2007, J. Artif. Intell. Res..
[15] Dan Lovallo,et al. Delusion and Deception in Large Infrastructure Projects: Two Models for Explaining and Preventing Executive Disaster , 2009, 1303.7403.
[16] D. Silverman. Interpreting Qualitative Data , 1993 .
[17] Simon Bennett. Managing Maintenance Error: A Practical Guide , 2004 .
[18] Christopher Powell. Responding to marginalisation , 1997, Architectural Research Quarterly.
[19] J. Reason. Human error: models and management , 2000, BMJ : British Medical Journal.
[20] Andrew D. Seidel,et al. Architects and their practices : a changing profession , 1995 .
[21] Florian Znaniecki,et al. The method of sociology , 1934 .
[22] G. Winch,et al. MANAGING THE KNOWLEDGE-BASED ORGANIZATION: THE CASE OF ARCHITECTURAL PRACTICE , 1993 .
[23] P. Love,et al. Uncertainty avoidance: public sector clients and procurement selection , 2008 .
[24] Sai On Cheung,et al. Are Construction Disputes Inevitable? , 2006, IEEE Transactions on Engineering Management.
[25] Peter E.D. Love,et al. Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects , 2009 .
[26] Lois W. Sayrs. Interviews : an introduction to qualitative research interviewing , 1996 .
[27] Stephen Fox,et al. Design for manufacture: A strategy for successful application to buildings , 2001 .
[28] Y. Kwak,et al. Towards a Comprehensive Understanding of Public Private Partnerships for Infrastructure Development , 2009 .
[29] Ming Xu,et al. Comparative performance of PPPs and traditional procurement in Australia , 2007 .
[30] P. Love,et al. Contract Documentation and the Incidence of Rework in Projects , 2005 .
[31] Graham Winch,et al. The strategic management of architectural practice , 1993 .
[32] Philip B. Crosby,et al. Quality Is Free: The Art of Making Quality Certain , 1979 .
[33] Peter E.D. Love,et al. Loosening the Gordian knot: the role of emotional intelligence in construction , 2011 .
[34] B. Flyvbjerg. Five Misunderstandings About Case-Study Research , 2006, 1304.1186.
[35] Derek H.T. Walker,et al. An investigation into construction time performance , 1995 .
[36] Klaus Krippendorff,et al. Content Analysis: An Introduction to Its Methodology , 1980 .
[37] Geoff Rounce. Quality, waste and cost considerations in architectural building design management , 1998 .
[38] Sergios Lambropoulos,et al. Road tunnels construction cost estimation: a structural equation model development and comparison , 2010, Oper. Res..
[39] Andi,et al. Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process , 2003 .
[40] Michael Baillie,et al. Dendrochronology raises questions about the nature of the AD 536 dust-veil event , 1994 .