Parallel machines with rescheduling, fixed due date, machine breakdown to reduce makespan and tardiness

[1]  Liang Gao,et al.  A multi-start variable neighbourhood descent algorithm for hybrid flowshop rescheduling , 2019, Swarm Evol. Comput..

[2]  Osman Kulak,et al.  Hybrid genetic algorithms for minimizing makespan in dynamic job shop scheduling problem , 2016, Comput. Ind. Eng..

[3]  Kejia Zhuang,et al.  Hybrid artificial bee colony algorithm with a rescheduling strategy for solving flexible job shop scheduling problems , 2017, Comput. Ind. Eng..

[4]  Bartlomiej Przybylski,et al.  A new model of parallel-machine scheduling with integral-based learning effect , 2018, Comput. Ind. Eng..

[5]  V. Poongothai,et al.  A simulated annealing approach for the non-identical parallel batch processing machines to minimize total weighted tardiness , 2019 .

[6]  Pranab K. Muhuri,et al.  On arrival scheduling of real-time precedence constrained tasks on multi-processor systems using genetic algorithm , 2019, Future Gener. Comput. Syst..

[7]  Joseph Y.-T. Leung,et al.  Scheduling unrelated parallel batch processing machines with non-identical job sizes and unequal ready times , 2017, Comput. Oper. Res..

[8]  Zhihui Xue,et al.  Review of Scheduling computer and manufacturing processes by Jacek Blazewicz, Klaus H. Ecker, Erwin Pesch, Guenter Schmidt, Jan Weglarz Springer-Verlag 2001 , 2003 .

[9]  Charles E Ebeling,et al.  An Introduction to Reliability and Maintainability Engineering , 1996 .

[10]  Yeong-Dae Kim,et al.  Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine , 2017, Comput. Ind. Eng..

[11]  Belén Melián-Batista,et al.  A hybrid metaheuristic algorithm for a parallel machine scheduling problem with dependent setup times , 2019, Comput. Ind. Eng..

[12]  T.C.E. Cheng,et al.  Parallel-machine rescheduling with job unavailability and rejection , 2018, Omega.

[13]  V. Poongothai,et al.  Unrelated parallel machine scheduling with multi-maintenance activities using CPLEX , 2019 .

[14]  T. C. Edwin Cheng,et al.  Rescheduling on identical parallel machines with machine disruptions to minimize total completion time , 2016, Eur. J. Oper. Res..

[15]  Hans Kellerer,et al.  A fast FPTAS for single machine scheduling problem of minimizing total weighted earliness and tardiness about a large common due date , 2020 .