Capacitated multi-objective disassembly scheduling with fuzzy processing time via a fruit fly optimization algorithm
暂无分享,去创建一个
[1] Guangdong Tian,et al. Energy-time tradeoffs for remanufacturing system scheduling using an invasive weed optimization algorithm , 2021, Journal of Intelligent Manufacturing.
[2] Shixin Liu,et al. Multiresource-Constrained Selective Disassembly With Maximal Profit and Minimal Energy Consumption , 2021, IEEE Transactions on Automation Science and Engineering.
[3] MengChu Zhou,et al. Biobjective Task Scheduling for Distributed Green Data Centers , 2021, IEEE Transactions on Automation Science and Engineering.
[4] Hao Zheng,et al. An energy-saving optimization method for cyclic pick-and-place tasks based on flexible joint configurations , 2021, Robotics Comput. Integr. Manuf..
[5] MengChu Zhou,et al. Stochastic multi-objective integrated disassembly-reprocessing-reassembly scheduling via fruit fly optimization algorithm , 2021 .
[6] NaiQi Wu,et al. Multiobjective Scheduling of Dual-Blade Robotic Cells in Wafer Fabrication , 2020, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[7] Yixiong Feng,et al. Data-driven customer requirements discernment in the product lifecycle management via intuitionistic fuzzy sets and electroencephalogram , 2018, Journal of Intelligent Manufacturing.
[8] Raymond Chiong,et al. Remanufacturing-oriented process planning and scheduling: mathematical modelling and evolutionary optimisation , 2020, Int. J. Prod. Res..
[9] Xinyu Li,et al. Energy consumption and profit-oriented disassembly line balancing for waste electrical and electronic equipment , 2020 .
[10] Duc Truong Pham,et al. Disassembly sequence planning using discrete Bees algorithm for human-robot collaboration in remanufacturing , 2020, Robotics Comput. Integr. Manuf..
[11] El-Houssaine Aghezzaf,et al. A linearisation approach to the stochastic dynamic capacitated lotsizing problem with sequence-dependent changeovers , 2020, Int. J. Prod. Res..
[12] Gang Yuan,et al. Comprehensive evaluation of disassembly performance based on the ultimate cross-efficiency and extension-gray correlation degree , 2020 .
[13] Gang Yuan,et al. Multi-objective low-carbon disassembly line balancing for agricultural machinery using MDFOA and fuzzy AHP , 2019, Journal of Cleaner Production.
[14] Duc Truong Pham,et al. Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations , 2019, Eur. J. Oper. Res..
[15] Xiaoyu Tian,et al. Capacitated disassembly scheduling and pricing of returned products with price-dependent yield , 2019, Omega.
[16] MengChu Zhou,et al. Modeling and Planning for Dual-Objective Selective Disassembly Using and/or Graph and Discrete Artificial Bee Colony , 2019, IEEE Transactions on Industrial Informatics.
[17] Eren Özceylan,et al. Disassembly line balancing problem: a review of the state of the art and future directions , 2019, Int. J. Prod. Res..
[18] Yixiong Feng,et al. Flexible Process Planning and End-of-Life Decision-Making for Product Recovery Optimization Based on Hybrid Disassembly , 2019, IEEE Transactions on Automation Science and Engineering.
[19] Shi-Zhuan Han,et al. Construct the prediction model for China agricultural output value based on the optimization neural network of fruit fly optimization algorithm , 2018, Future Gener. Comput. Syst..
[20] Chaoyong Zhang,et al. An asynchronous parallel disassembly planning based on genetic algorithm , 2018, Eur. J. Oper. Res..
[21] Hyoung-Ho Doh,et al. Multi-period disassembly levelling and lot-sizing for multiple product types with parts commonality , 2018 .
[22] MengChu Zhou,et al. Disassembly Sequence Planning Considering Fuzzy Component Quality and Varying Operational Cost , 2018, IEEE Transactions on Automation Science and Engineering.
[23] Zhi-Hai Zhang,et al. Capacitated disassembly scheduling under stochastic yield and demand , 2017, Eur. J. Oper. Res..
[24] Karl Inderfurth,et al. A heuristic solution method for disassemble-to-order problems with binomial disassembly yields , 2017 .
[25] Surendra M. Gupta,et al. A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem , 2016, Ann. Oper. Res..
[26] MengChu Zhou,et al. Incorporation of Optimal Computing Budget Allocation for Ordinal Optimization Into Learning Automata , 2016, IEEE Transactions on Automation Science and Engineering.
[27] Sencer Yeralan,et al. A disassembly line balancing problem with fixed number of workstations , 2016, Eur. J. Oper. Res..
[28] Zhi-Hai Zhang,et al. Capacitated disassembly scheduling with parts commonality and start-up cost and its industrial application , 2016 .
[29] Hyoung-Ho Doh,et al. Disassembly leveling and lot sizing for multiple product types: a basic model and its extension , 2016 .
[30] Karl Inderfurth,et al. How Yield Process Misspecification Affects the Solution of Disassemble-to-order Problems , 2015 .
[31] Y. Barba-Gutiérreza,et al. Lot sizing in reverse MRP for scheduling disassembly , 2015 .
[32] Jaime A. Camelio,et al. Partial disassembly sequencing considering acquired end-of-life product age distributions , 2014 .
[33] Zhi-Hua Hu,et al. Path-relinking Tabu search for the multi-objective flexible job shop scheduling problem , 2014, Comput. Oper. Res..
[34] Reza Ahmadi,et al. Optimal maintenance scheduling for a complex manufacturing system subject to deterioration , 2014, Ann. Oper. Res..
[35] Christian Ullerich,et al. Flexible disassembly planning considering product conditions , 2013 .
[36] Shona D. Morgan,et al. A systematic literature review of remanufacturing scheduling , 2013 .
[37] Roberto Rossi,et al. Piecewise linear approximations for the static-dynamic uncertainty strategy in stochastic lot-sizing , 2013, ArXiv.
[38] Hsiao-Fan Wang,et al. A two-stage robust programming approach to demand-driven disassembly planning for a closed-loop supply chain system , 2013 .
[39] Stefan Helber,et al. Dynamic capacitated lot sizing with random demand and dynamic safety stocks , 2013, OR Spectr..
[40] Manoj Kumar Tiwari,et al. Constraint-based simulated annealing (CBSA) approach to solve the disassembly scheduling problem , 2012 .
[41] Wen-Tsao Pan,et al. A new Fruit Fly Optimization Algorithm: Taking the financial distress model as an example , 2012, Knowl. Based Syst..
[42] Roberto Rossi,et al. An efficient computational method for a stochastic dynamic lot-sizing problem under service-level constraints , 2011, Eur. J. Oper. Res..
[43] Dong-Ho Lee,et al. A heuristic for multi-period disassembly leveling and scheduling , 2011, 2011 IEEE/SICE International Symposium on System Integration (SII).
[44] Horst Tempelmeier,et al. Dynamic uncapacitated lot sizing with random demand under a fillrate constraint , 2011, Eur. J. Oper. Res..
[45] Loo Hay Lee,et al. Stochastic Simulation Optimization - An Optimal Computing Budget Allocation , 2010, System Engineering and Operations Research.
[46] P. Xirouchakis,et al. Capacitated disassembly scheduling with random demand , 2010 .
[47] Mehmet Ali Ilgin,et al. Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.
[48] S. Baskar,et al. Application of NSGA-II Algorithm to Single-Objective Transmission Constrained Generation Expansion Planning , 2009, IEEE Transactions on Power Systems.
[49] Surendra M. Gupta,et al. Lot sizing in reverse MRP for scheduling disassembly , 2008 .
[50] Dong-Ho Lee,et al. Disassembly scheduling: literature review and future research directions , 2007 .
[51] Surendra M. Gupta,et al. Disassembly to order system under uncertainty , 2006 .
[52] Dong-Ho Lee,et al. A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints , 2006, J. Oper. Res. Soc..
[53] Karl Inderfurth,et al. Heuristics for solving disassemble-to-order problems with stochastic yields , 2006, OR Spectr..
[54] Dong-Ho Lee,et al. A two-stage heuristic for disassembly scheduling with assembly product structure , 2004, J. Oper. Res. Soc..
[55] Yigal Gerchak,et al. Multiple Lotsizing in Production to Order with Random Yields: Review of Recent Advances , 2004, Ann. Oper. Res..
[56] P. Xirouchakis,et al. Disassembly Scheduling with Multiple Product Types , 2003 .
[57] MengChu Zhou,et al. Integration of disassembly leveling and bin assignment for demanufacturing automation , 2002, IEEE Trans. Robotics Autom..
[58] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[59] Paul Xirouchakis,et al. Disassembly Scheduling with Capacity Constraints , 2002 .
[60] Masatoshi Sakawa,et al. Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms , 2000, Eur. J. Oper. Res..
[61] Lothar Thiele,et al. Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach , 1999, IEEE Trans. Evol. Comput..
[62] Surendra M. Gupta,et al. Disassembly sequence planning for products with defective parts in product recovery , 1998 .
[63] Surendra M. Gupta,et al. Disassembly of multiple product structures , 1997 .
[64] Hau L. Lee,et al. Lot Sizing with Random Yields: A Review , 1995, Oper. Res..