Capacitated multi-objective disassembly scheduling with fuzzy processing time via a fruit fly optimization algorithm

[1]  Guangdong Tian,et al.  Energy-time tradeoffs for remanufacturing system scheduling using an invasive weed optimization algorithm , 2021, Journal of Intelligent Manufacturing.

[2]  Shixin Liu,et al.  Multiresource-Constrained Selective Disassembly With Maximal Profit and Minimal Energy Consumption , 2021, IEEE Transactions on Automation Science and Engineering.

[3]  MengChu Zhou,et al.  Biobjective Task Scheduling for Distributed Green Data Centers , 2021, IEEE Transactions on Automation Science and Engineering.

[4]  Hao Zheng,et al.  An energy-saving optimization method for cyclic pick-and-place tasks based on flexible joint configurations , 2021, Robotics Comput. Integr. Manuf..

[5]  MengChu Zhou,et al.  Stochastic multi-objective integrated disassembly-reprocessing-reassembly scheduling via fruit fly optimization algorithm , 2021 .

[6]  NaiQi Wu,et al.  Multiobjective Scheduling of Dual-Blade Robotic Cells in Wafer Fabrication , 2020, IEEE Transactions on Systems, Man, and Cybernetics: Systems.

[7]  Yixiong Feng,et al.  Data-driven customer requirements discernment in the product lifecycle management via intuitionistic fuzzy sets and electroencephalogram , 2018, Journal of Intelligent Manufacturing.

[8]  Raymond Chiong,et al.  Remanufacturing-oriented process planning and scheduling: mathematical modelling and evolutionary optimisation , 2020, Int. J. Prod. Res..

[9]  Xinyu Li,et al.  Energy consumption and profit-oriented disassembly line balancing for waste electrical and electronic equipment , 2020 .

[10]  Duc Truong Pham,et al.  Disassembly sequence planning using discrete Bees algorithm for human-robot collaboration in remanufacturing , 2020, Robotics Comput. Integr. Manuf..

[11]  El-Houssaine Aghezzaf,et al.  A linearisation approach to the stochastic dynamic capacitated lotsizing problem with sequence-dependent changeovers , 2020, Int. J. Prod. Res..

[12]  Gang Yuan,et al.  Comprehensive evaluation of disassembly performance based on the ultimate cross-efficiency and extension-gray correlation degree , 2020 .

[13]  Gang Yuan,et al.  Multi-objective low-carbon disassembly line balancing for agricultural machinery using MDFOA and fuzzy AHP , 2019, Journal of Cleaner Production.

[14]  Duc Truong Pham,et al.  Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations , 2019, Eur. J. Oper. Res..

[15]  Xiaoyu Tian,et al.  Capacitated disassembly scheduling and pricing of returned products with price-dependent yield , 2019, Omega.

[16]  MengChu Zhou,et al.  Modeling and Planning for Dual-Objective Selective Disassembly Using and/or Graph and Discrete Artificial Bee Colony , 2019, IEEE Transactions on Industrial Informatics.

[17]  Eren Özceylan,et al.  Disassembly line balancing problem: a review of the state of the art and future directions , 2019, Int. J. Prod. Res..

[18]  Yixiong Feng,et al.  Flexible Process Planning and End-of-Life Decision-Making for Product Recovery Optimization Based on Hybrid Disassembly , 2019, IEEE Transactions on Automation Science and Engineering.

[19]  Shi-Zhuan Han,et al.  Construct the prediction model for China agricultural output value based on the optimization neural network of fruit fly optimization algorithm , 2018, Future Gener. Comput. Syst..

[20]  Chaoyong Zhang,et al.  An asynchronous parallel disassembly planning based on genetic algorithm , 2018, Eur. J. Oper. Res..

[21]  Hyoung-Ho Doh,et al.  Multi-period disassembly levelling and lot-sizing for multiple product types with parts commonality , 2018 .

[22]  MengChu Zhou,et al.  Disassembly Sequence Planning Considering Fuzzy Component Quality and Varying Operational Cost , 2018, IEEE Transactions on Automation Science and Engineering.

[23]  Zhi-Hai Zhang,et al.  Capacitated disassembly scheduling under stochastic yield and demand , 2017, Eur. J. Oper. Res..

[24]  Karl Inderfurth,et al.  A heuristic solution method for disassemble-to-order problems with binomial disassembly yields , 2017 .

[25]  Surendra M. Gupta,et al.  A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem , 2016, Ann. Oper. Res..

[26]  MengChu Zhou,et al.  Incorporation of Optimal Computing Budget Allocation for Ordinal Optimization Into Learning Automata , 2016, IEEE Transactions on Automation Science and Engineering.

[27]  Sencer Yeralan,et al.  A disassembly line balancing problem with fixed number of workstations , 2016, Eur. J. Oper. Res..

[28]  Zhi-Hai Zhang,et al.  Capacitated disassembly scheduling with parts commonality and start-up cost and its industrial application , 2016 .

[29]  Hyoung-Ho Doh,et al.  Disassembly leveling and lot sizing for multiple product types: a basic model and its extension , 2016 .

[30]  Karl Inderfurth,et al.  How Yield Process Misspecification Affects the Solution of Disassemble-to-order Problems , 2015 .

[31]  Y. Barba-Gutiérreza,et al.  Lot sizing in reverse MRP for scheduling disassembly , 2015 .

[32]  Jaime A. Camelio,et al.  Partial disassembly sequencing considering acquired end-of-life product age distributions , 2014 .

[33]  Zhi-Hua Hu,et al.  Path-relinking Tabu search for the multi-objective flexible job shop scheduling problem , 2014, Comput. Oper. Res..

[34]  Reza Ahmadi,et al.  Optimal maintenance scheduling for a complex manufacturing system subject to deterioration , 2014, Ann. Oper. Res..

[35]  Christian Ullerich,et al.  Flexible disassembly planning considering product conditions , 2013 .

[36]  Shona D. Morgan,et al.  A systematic literature review of remanufacturing scheduling , 2013 .

[37]  Roberto Rossi,et al.  Piecewise linear approximations for the static-dynamic uncertainty strategy in stochastic lot-sizing , 2013, ArXiv.

[38]  Hsiao-Fan Wang,et al.  A two-stage robust programming approach to demand-driven disassembly planning for a closed-loop supply chain system , 2013 .

[39]  Stefan Helber,et al.  Dynamic capacitated lot sizing with random demand and dynamic safety stocks , 2013, OR Spectr..

[40]  Manoj Kumar Tiwari,et al.  Constraint-based simulated annealing (CBSA) approach to solve the disassembly scheduling problem , 2012 .

[41]  Wen-Tsao Pan,et al.  A new Fruit Fly Optimization Algorithm: Taking the financial distress model as an example , 2012, Knowl. Based Syst..

[42]  Roberto Rossi,et al.  An efficient computational method for a stochastic dynamic lot-sizing problem under service-level constraints , 2011, Eur. J. Oper. Res..

[43]  Dong-Ho Lee,et al.  A heuristic for multi-period disassembly leveling and scheduling , 2011, 2011 IEEE/SICE International Symposium on System Integration (SII).

[44]  Horst Tempelmeier,et al.  Dynamic uncapacitated lot sizing with random demand under a fillrate constraint , 2011, Eur. J. Oper. Res..

[45]  Loo Hay Lee,et al.  Stochastic Simulation Optimization - An Optimal Computing Budget Allocation , 2010, System Engineering and Operations Research.

[46]  P. Xirouchakis,et al.  Capacitated disassembly scheduling with random demand , 2010 .

[47]  Mehmet Ali Ilgin,et al.  Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.

[48]  S. Baskar,et al.  Application of NSGA-II Algorithm to Single-Objective Transmission Constrained Generation Expansion Planning , 2009, IEEE Transactions on Power Systems.

[49]  Surendra M. Gupta,et al.  Lot sizing in reverse MRP for scheduling disassembly , 2008 .

[50]  Dong-Ho Lee,et al.  Disassembly scheduling: literature review and future research directions , 2007 .

[51]  Surendra M. Gupta,et al.  Disassembly to order system under uncertainty , 2006 .

[52]  Dong-Ho Lee,et al.  A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints , 2006, J. Oper. Res. Soc..

[53]  Karl Inderfurth,et al.  Heuristics for solving disassemble-to-order problems with stochastic yields , 2006, OR Spectr..

[54]  Dong-Ho Lee,et al.  A two-stage heuristic for disassembly scheduling with assembly product structure , 2004, J. Oper. Res. Soc..

[55]  Yigal Gerchak,et al.  Multiple Lotsizing in Production to Order with Random Yields: Review of Recent Advances , 2004, Ann. Oper. Res..

[56]  P. Xirouchakis,et al.  Disassembly Scheduling with Multiple Product Types , 2003 .

[57]  MengChu Zhou,et al.  Integration of disassembly leveling and bin assignment for demanufacturing automation , 2002, IEEE Trans. Robotics Autom..

[58]  Kalyanmoy Deb,et al.  A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..

[59]  Paul Xirouchakis,et al.  Disassembly Scheduling with Capacity Constraints , 2002 .

[60]  Masatoshi Sakawa,et al.  Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms , 2000, Eur. J. Oper. Res..

[61]  Lothar Thiele,et al.  Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach , 1999, IEEE Trans. Evol. Comput..

[62]  Surendra M. Gupta,et al.  Disassembly sequence planning for products with defective parts in product recovery , 1998 .

[63]  Surendra M. Gupta,et al.  Disassembly of multiple product structures , 1997 .

[64]  Hau L. Lee,et al.  Lot Sizing with Random Yields: A Review , 1995, Oper. Res..