Key Concepts in Modeling Product Development
暂无分享,去创建一个
[1] Bernhard Rumpe,et al. Behavioral Specifications of Businesses and Systems , 1999, Behavioral Specifications of Businesses and Systems.
[2] Tom R. Burns,et al. The Management of Innovation. , 1963 .
[3] Kevin Crowston,et al. Tools for Inventing Organizations: Toward a Handbook of Organizational Processes , 1999 .
[4] Barry Boehm,et al. Balancing Agility and Dis-cipline: A Guide for the Perplexed , 2003 .
[5] S. Spear,et al. Decoding the DNA of the Toyota Production System , 1999 .
[6] Peter John Clarkson,et al. ‘Signposting’, A Parameter-driven Task-based Model of the Design Process , 2000 .
[7] B. D. O'Donovan,et al. Signposting: modelling uncertainty in design processes , 2003 .
[8] Kim B. Clark,et al. Design Rules: The Power of Modularity , 2000 .
[9] Lorraine Pajerek. Processes and organizations as systems: when the processors are people, not pentiums , 2000 .
[10] Jay R. Galbraith. Organization Design , 1977 .
[11] Steven D. Eppinger,et al. A Model-Based Framework to Overlap Product Development Activities , 1997 .
[12] Salah E. Elmaghraby,et al. Activity nets: A guided tour through some recent developments , 1995 .
[13] Robert G. Cooper,et al. Winning at new products : accelerating the process from idea to launch , 2001 .
[14] Tyson R. Browning. Process integration using the design structure matrix , 2002 .
[15] Nicola Senin,et al. Distributed Object-Based Modeling in Design Simulation Marketplace , 2003 .
[16] Semyon Savransky,et al. Engineering of Creativity: Introduction to TRIZ Methodology of Inventive Problem Solving , 2000 .
[17] Deborah Dougherty,et al. Reimagining the Differentiation and Integration of Work for Sustained Product Innovation , 2001 .
[18] Herbert Negele,et al. ZOPH – A Systemic Approach to the Modeling of Product Development Systems , 1997 .
[19] Robert P. Smith,et al. The historical roots of concurrent engineering fundamentals , 1997 .
[20] Reza H. Ahmadi,et al. Managing Development Risk in Product Design Processes , 1999, Oper. Res..
[21] Wes Crump,et al. An Integrated Enterprise Modeling Environment , 1998 .
[22] D. V. Steward,et al. The design structure system: A method for managing the design of complex systems , 1981, IEEE Transactions on Engineering Management.
[23] David A. Marca,et al. IDEFO - SADT Business Process and Enterprise Modelling , 1993 .
[24] Michael T. Pich,et al. Managing project uncertainty: from variation to chaos , 2002, IEEE Engineering Management Review.
[25] Tyson R. Browning,et al. 9.1.2 Adaptive Test Process – Designing a Project Plan that Adapts to the State of a Project , 2005 .
[26] Claudia Eckert,et al. Design planning and modelling , 2005 .
[27] Paul Lillrank. The broom and nonroutine processes: a metaphor for understanding variability in organizations , 2002 .
[28] Keith Popplewell,et al. Supporting enterprise design through multiple views , 2000 .
[29] Steven D. Eppinger,et al. Patterns of Product Development Interactions , 2002 .
[30] William J. Kolarik,et al. A Review of Enterprise Process Modelling Techniques , 2003 .
[31] David N. Ford,et al. Dynamic modeling of product development processes , 1998 .
[32] Earll M. Murman,et al. Product development process capture and display using Web-based technologies , 1998, SMC'98 Conference Proceedings. 1998 IEEE International Conference on Systems, Man, and Cybernetics (Cat. No.98CH36218).
[33] August-Wilhelm Scheer,et al. ARIS - Business Process Frameworks , 1998 .
[34] Robert T. Clemen,et al. Making Hard Decisions: An Introduction to Decision Analysis , 1997 .
[35] Andrew N. Baldwin,et al. Integrating design in the project process , 2000 .
[36] Paul S. Adler,et al. From project to process management: an empirically-based framework for analyzing product development time , 1995 .
[37] James A. Highsmith,et al. Adaptive Software Development: A Collaborative Approach to Managing Complex Systems , 1999 .
[38] John A. Zachman,et al. A Framework for Information Systems Architecture , 1987, IBM Syst. J..
[39] Kim B. Clark,et al. Product development performance : strategy, organization, and management in the world auto industry / Kim B. Clark, Tahahiro Fujimoto , 1991 .
[40] Armin P. Schulz,et al. 7.2.3 A generic approach to implement information‐based system development , 2000 .
[41] Donald H. Liles,et al. Engineering the Virtual Enterprise: An Architecture-Driven Modeling Approach , 2001 .
[42] Harry E. Crisp,et al. 5.4.4 An Integrated Information Representation Schema for Complex Human Centric Systems , 2000 .
[43] Herbert Negele,et al. 4 Modeling of Integrated Product Development Processes , 1999 .
[44] Ronald A. Radice,et al. A Programming Process Architecture , 1985, IBM Syst. J..
[45] David N. Ford,et al. Overcoming the 90% Syndrome: Iteration Management in Concurrent Development Projects , 2003, Concurr. Eng. Res. Appl..
[46] Christoph H. Loch,et al. Measuring the Effectiveness of Overlapping Development Activities , 1999 .
[47] Robert P. Smith,et al. Product development process modeling , 1999 .
[48] Mohan V. Tatikonda,et al. Successful execution of product development projects: Balancing firmness and flexibility in the innovation process , 2000 .
[49] S D Eppinger,et al. Innovation at the speed of information. , 2001, Harvard business review.
[50] Tyson R. Browning,et al. Applying the design structure matrix to system decomposition and integration problems: a review and new directions , 2001, IEEE Trans. Engineering Management.
[51] George A. Hazelrigg,et al. On the role and use of mathematical models in engineering design , 1999 .
[52] B. W. Taylor,et al. R&D Project Planning with Q-GERT Network Modeling and Simulation , 1980 .
[53] J.D. Sterman,et al. Nobody Ever Gets Credit for Fixing Problems That Never Happened: Creating and Sustaining Process Improvement , 2001, IEEE Engineering Management Review.
[54] Richard J. Mayer,et al. The IDEF Family of Languages , 1998 .
[55] Tyson R. Browning,et al. Modeling and analyzing cost, schedule, and performance in complex system product development , 1998 .
[56] S. J. Kline,et al. Innovation Is Not a Linear Process , 1985 .
[57] Stuart Pugh,et al. Total Design: Integrated Methods for Successful Product Engineering , 1991 .
[58] Eric S. Raymond,et al. The cathedral and the bazaar - musings on Linux and Open Source by an accidental revolutionary , 2001 .
[59] Simon A. Austin,et al. Mapping the conceptual design activity of interdisciplinary teams , 2001 .
[60] David I. Cleland. The evolution of project management , 2004, IEEE Transactions on Engineering Management.
[61] Frank L. Lewis,et al. A new matrix model for discrete event systems: application to simulation , 1997 .
[62] Brian T. Pentland,et al. Making Process Visible: A Grammatical Approach to Managing Design Processes , 2002 .
[63] Gabriel A. Pall. The Process-Centered Enterprise: The Power of Commitments , 1999 .
[64] J. Hauser,et al. The House of Quality , 1988 .
[65] Shih-Chien Chou,et al. ProActNet: Modeling Processes Through Activity Networks , 2002, Int. J. Softw. Eng. Knowl. Eng..
[66] H. Negele,et al. Modeling of concurrent engineering processes for integrated systems development , 1998, 17th DASC. AIAA/IEEE/SAE. Digital Avionics Systems Conference. Proceedings (Cat. No.98CH36267).
[67] Kevin Forsberg,et al. Visualizing Project Management , 1996 .
[68] Robert P. Smith,et al. A predictive model of sequential iteration in engineering design , 1997 .
[69] Peter Bernus,et al. Handbook on Architectures of Information Systems , 1999 .
[70] Li Pheng Khoo,et al. Control and Monitoring of Concurrent Design Tasks in a Dynamic Environment , 2004, Concurr. Eng. Res. Appl..
[71] David N. Ford,et al. Product development resource allocation with foresight , 2005, Eur. J. Oper. Res..
[72] Terry Winograd,et al. Understanding computers and cognition - a new foundation for design , 1987 .
[73] Hugh L. McManus,et al. Value stream analysis and mapping for product development , 2002 .
[74] Michael L. Tushman,et al. Information Processing as an Integrating Concept in Organizational Design. , 1978 .
[75] Hong-Bae Jun,et al. The hierarchical frame of enterprise activity modeling (HF-EAM) , 2002, IEEE Trans. Engineering Management.
[76] Craig Schlenoff,et al. The Process Specification Language (PSL) Overview and Version 1.0 Specification , 2000 .
[77] Yoji Akao,et al. Quality Function Deployment : Integrating Customer Requirements into Product Design , 1990 .
[78] Brian T. Pentland,et al. Grammatical Models of Organizational Processes , 1995 .