Quality in construction management: an exploratory study
暂无分享,去创建一个
[1] James A. Powell,et al. Assessing the level of teamwork in Brazilian and English construction sites , 2001 .
[2] Kenneth K. Eastman,et al. Images of quality: deconstructing the quest for excellence , 2001 .
[3] Nabil Kartam,et al. Design/construction integration: issues and illustrative prototype , 1999 .
[4] Alfredo Serpell. Integrating quality systems in construction projects: the Chilean case , 1999 .
[5] Susan B. Gerber,et al. Using SPSS for Windows: Data Analysis and Graphics , 1999 .
[6] David Arditi,et al. Total quality management in the construction process , 1997 .
[7] A. Türk,et al. ISO 9000 in construction: An examination of its application in Turkey , 2006 .
[8] Mohammed A. Salem Hiyassat. Applying the ISO standards to a construction company: a case study , 2000 .
[9] Andrew W.T. Lau,et al. A survey on the advancement of QA (quality assurance) to TQM (total quality management) for construction contractors in Hong Kong , 2009 .
[10] Sibin Wu,et al. Competitive strategy, TQM practice, and continuous improvement of international project management , 2009 .
[11] Hisham M. Abdelsalam,et al. Cost of quality in Dubai: An analytical case study of residential construction projects , 2009 .
[12] David Gadenne,et al. An inter-industry comparison of quality management practices and performance , 2002 .
[13] Lianying Zhang,et al. Improving performance of construction projects , 2013 .
[14] Michael Pitt,et al. Awareness and effectiveness of quality function deployment (QFD) in design and build projects in Nigeria , 2014 .
[15] Abdul-Rashid Abdul-Aziz. The realities of applying total quality management in the construction industry , 2002 .
[16] Albert P.C. Chan,et al. Key performance indicators for measuring construction success , 2004 .
[17] David Bryde,et al. ISO 9000 certification and construction project performance: The Malaysian experience , 2011 .
[18] Anthony Mills,et al. Embracing off-site innovation in construction in China to enhance a sustainable built environment in urban housing , 2014 .
[19] Low Sui Pheng,et al. Strategic quality management for the construction industry , 2005 .
[20] Van Truong Luu,et al. Improving project management performance of large contractors using benchmarking approach , 2008 .
[21] Derek H.T. Walker,et al. Integrating OHS, EMS and QM with constructability principles when construction planning – a design and construct project case study , 2001 .
[22] Ghassan Aouad,et al. Rethinking construction: the Generic Design and Construction Process Protocol , 2000 .
[23] Low Sui Pheng,et al. Implementing Total Quality Management in Construction Firms , 2004 .
[24] Akintola Akintoye,et al. Design and build: a survey of architects' views , 1995 .
[25] Low Sui Pheng,et al. A framework for implementing TQM in construction , 1996 .
[26] Refaat H. Abdel-Razek. Factors affecting construction quality in Egypt: identification and relative importance , 1998 .
[27] M. Talat Birgonul,et al. The evidence of poor quality in high rise and medium rise housing units: a case study of mass housing projects in Turkey , 2005 .
[28] K. Lai,et al. Initiatives and outcomes of quality management implementation across industries , 2003 .
[29] Trefor P. Williams,et al. Application of TQM to Environmental Construction , 2001 .
[30] Evangelos Psomas,et al. The impact of “soft” and “hard” TQM elements on quality management results , 2009 .
[31] Yehiel Rosenfeld,et al. Using Quality Circles to Raise Productivity and Quality of Work Life , 1992 .
[32] Serdar Ulubeyli,et al. The quality perspective of the ready-mixed concrete industry in Turkey , 2004 .
[33] C. Steiner. A role for individuality and mystery in “managing” change , 2001 .
[34] James L. Burati,et al. Implementing TQM in Engineering and Construction , 1993 .
[35] Ihab Hanna Sawalha,et al. Quality control and supply chain management: a contextual perspective and a case study , 2013 .
[36] James Sommerville,et al. A scorecard approach to benchmarking for total quality construction , 2000 .
[37] Gerald W. Chase,et al. Applying Total Quality Management to Design and Construction , 1993 .
[38] J. C. Mallon,et al. Quality function deployment: a system for meeting customers' needs , 1993 .
[39] Nashwan Mohammed Noman Saeed. THE EFFECT OF TOTAL QUALITY MANAGEMENT ON CONSTRUCTION FIRMS PERFORMANCE CASE STUDY : CONSTRUCTION FIRMS IN YEMEN , 2012 .
[40] Theo Haupt,et al. Inhibiting factors of implementing total quality management on construction sites , 2004 .
[41] James L. Burati,et al. Quality Management Organizations and Techniques , 1992 .
[42] Gordon Culp,et al. Implementing TQM in Consulting Engineering Firm , 1993 .
[43] R. Walker,et al. Total Quality Management and Performance , 2002 .
[44] Ka Chi Lam,et al. The TQM journey of Hong Kong building contractors: from a self‐assessment perspective , 2008 .
[45] Joo-Youn Jung,et al. Relationship between total quality management (TQM) and continuous improvement of international project management (CIIPM) , 2006 .
[46] Patrick T.I. Lam,et al. Assessing quality relationships in public housing: An empirical study , 2006 .
[47] M. Haseeb,et al. PROBLEMS OF PROJECTS AND EFFECTS OF DELAYS IN THE CONSTRUCTION INDUSTRY OF PAKISTAN , 2012, Australian Journal of Business and Management Research.
[48] Mohamed Aichouni,et al. An empirical study of quality management systems in the Saudi construction industry , 2014 .
[49] Ramdane Djebarni,et al. Achieving quality and productivity in the house building sector , 1996 .
[50] Kerry London,et al. Construction Management: New Directions , 2002 .
[51] Sathyanarayanan Rajendran,et al. Relationship between Construction Safety and Quality Performance , 2013 .
[52] Robert C. Stroh,et al. Impact of Total Quality Management on Home-Buyer Satisfaction , 1999 .
[53] Quek Eng Eng,et al. A survey of TQM practices in the Malaysian electrical and electronic industry , 2003 .
[54] Albert P.C. Chan,et al. Factors affecting the quality of building projects in Hong Kong , 2000 .
[55] John Tookey,et al. Expanding the meaning of standardisation within construction processes , 2002 .
[56] Bhimaraya A. Metri. TQM CRITICAL SUCCESS FACTORS FOR CONSTRUCTION FIRMS , 2005 .
[57] P. D. Rwelamila,et al. Concrete quality management: a research study of the general contractor in South Africa , 1995 .
[58] L. J. Porter,et al. Total quality management—the critical success factors , 1993 .
[59] John S. Oakland,et al. Quality management in civil and structural engineering consulting , 1995 .
[60] Derek H.T. Walker,et al. Quality management in construction: An innovative advance using project alliancing in Australia , 2002 .
[61] Peter E.D. Love,et al. Some empirical observations of service quality in construction , 2000 .
[62] Ka Chi Lam,et al. A cooperative Internet-facilitated quality management environment for construction , 2006 .
[63] Richard A. Belle. BENCHMARKING AND ENHANCING BEST PRACTICES IN THE ENGINEERING AND CONSTRUCTION SECTOR , 2000 .
[64] George Ofori,et al. Implementing environmental management systems in construction: lessons from quality systems , 2002 .